
PWR-120 INSTALLATION MANUAL
4
2
SYSTEM WIRING: TEST
6) Apply the AC line voltage from the building installation or the DWS-SWITCH and check
that the PWR powers up correctly. The green DC-OK light should be on steady and the
overload light (red) should off.
7) Close and lock the PWR enclosure and check that it does not open (lock functions
correctly).
The PWR-120 installation is now complete.