10
Printer Installation
Use the Bolt-Down Openings
The printer includes bolt-down openings that you can use to secure it to a mounting surface.
You need the following supplies:
The bolt-down kit (part no. 512969-001) contains two M6 well nuts.
Two M6 (6 mm) screws, purchased separately.
The length of the screws you need depends on the thickness of the mounting surface. The
screw length is the surface thi 0.75 inch (20 mm).
Two M6 washers, purchased separately.
1/4-inch (7 mm) drill bit.
1.
Drill two holes in the mounting surface following the dimensions and requirements shown in
the following figure:
Summary of Contents for CE875
Page 8: ...viii ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 20: ...4 Printer Installation Multi Hopper Printer 13 4 in 340 mm 16 2 in 411 mm 25 6 in 651 mm ...
Page 28: ...12 Printer Installation Unpack the Optional Multi Hopper ...
Page 54: ...38 Printer Installation ...
Page 70: ...54 Elements of Card Design ...
Page 112: ...96 Printer Manager ...
Page 129: ...CR825 and CE875 Instant Issuance System Installation and Administrator s Guide A 9 ...