Programming Flowcharts
47
4
4
4
4
4
4
4
4
4
Simultaneous Operations
Configure the A/D subsystems that
you want to run simultaneously.
Put each subsystem to be
simultaneously started on the start list
using olDaPutDassToSSList.
Prestart the subsystems on the
simultaneous start list with
olDaSimultaneousPreStart.
Allocate a simultaneous start list using
olDaGetSSList.
Follow the continuous A/D flowchart
for each A/D subsystem, but do not
start the continuous operations.
Start the subsystems on the
simultaneous start list with
olDaSimultaneousStart.
Deal with messages (see
Stop the operation (see
).
Clean up the subsystem
(see
Summary of Contents for DT9820 Series
Page 1: ...DT9820 Series UM 18221 B User s Manual...
Page 4: ......
Page 7: ...Contents vii Appendix B Connector Pin Assignments 81 Index 87...
Page 8: ...Contents viii...
Page 13: ...1 1 Overview Features 2 Supported Software 4 Accessories 6...
Page 40: ...Chapter 2 28...
Page 41: ...29 3 Supported Device Driver Capabilities...
Page 52: ...Chapter 3 40...
Page 69: ...57 5 Calibration Running the Calibration Utility 59 Calibrating the Analog Output Subsystem 60...
Page 74: ...Chapter 5 62...
Page 84: ...Chapter 6 72...
Page 85: ...73 A Specifications...
Page 93: ...81 B Connector Pin Assignments...
Page 98: ...Appendix B 86...
Page 106: ...Index 94...
Page 108: ......
Page 112: ...Data Translation Support Policy...