Data I/O
FLX500
Chptr 3
—26—
Rerunning the PV-Kit
If you suspect a problem with the
FLX500
, you
can check to see if the problem is the
FLX500
and
not a device, algorithm, or power source, by
rerunning the PV-Kit job. All hardware required
to run the PV-Kit job, including 16 devices, came
with the
FLX500
. Contact Data I/O for informa-
tion about ordering replacement parts for the
PV-Kit.
NOTE: Be sure the Socket Adapters are
clean before running the PV-Kit job.
1.
Rerun the PV-Kit job. For instructions see
2.
Read the
Throughput
displayed on the sta-
tistics screen on the monitor by tapping the
Statistics
button
on the Run Window.
Record the PPH in the PV-Kit Performance
chart on page 47.
Figure 14—The Statistics Window displays
Throughput, often abbreviated as PPH.
If the PPH is the same as when the machine was
new (approximately 500 PPH) then you can
eliminate many of the possible error causes.
Summary of Contents for FLX500
Page 4: ... Data I O FLX500 ii ...
Page 12: ... Data I O FLX500 Chptr 1 8 blank page ...
Page 28: ... Data I O FLX500 Chptr 2 24 blank page ...
Page 40: ... Data I O FLX500 Chptr 4 36 blank page ...
Page 42: ... Data I O FLX500 Chptr 5 38 Daily Sign off Clean the sockets page 10 Date Initials Notes ...
Page 43: ...5 Sign off Charts Daily Sign off 39 Daily Sign off Date Initials Notes ...
Page 44: ... Data I O FLX500 Chptr 5 40 Daily Sign off Date Initials Notes ...
Page 45: ...5 Sign off Charts Daily Sign off 41 Daily Sign off Date Initials Notes ...
Page 46: ... Data I O FLX500 Chptr 5 42 Daily Sign off Date Initials Notes ...
Page 48: ... Data I O FLX500 Chptr 5 44 Weekly Sign off Date Initials Notes ...
Page 52: ... Data I O FLX500 Chptr 5 48 blank page ...
Page 57: ... FLX500 ...