34
Preventative maintenance,
continued
fans,
air ducts and
heating element
(2 years),
continued
Step
Action
Illustration
8 Ensure that all gaskets are sealed com-
pletely
before replacing the panel.
9 Check that all connections are securely connected to the PCB.
10 Mount the front panel
External:
Hoses and
duct connections (2
years)
Visually inspect:
1.
The duct connections at the top of the unit must be checked for leaks, which will
appear as dirty areas.
2.
Check drain hoses and valves for damage.
See more on page 17.
Ensure that there is water in the hose's siphon.
Summary of Contents for HCV 500
Page 1: ...1 096391 Version 2909 2017 HCV500 Service Manual Rev 1 4 5 EN...
Page 40: ...40 Dimensions HCV500...
Page 42: ...42...