14
Installation
: Installation options
Installation options
HCC 2 has a variety of installation options such as vertical or horizontal mounting, flexible
cable routing and duct connections making the unit adaptable to different locations. Check
the installation options and decide how the installation best fulfils the local demands.
Please ensure that the ceiling or walls structure is adequate to withstand the additional
weight of the unit.
Remember to reserve the mandatory service space.
All cable connection can be routed inside the unit, for exit through both end plates. This ena-
bles the installer to route and connect cables in best suitable way.
Option 1
Option 2
Introduction
Vertical or
horizontal
Fig. 12
Fig. 13
!
NOTICE
Cable routing
Summary of Contents for HCC 2 ALU
Page 1: ...HCC 2 ALU PLA E1 SERVICE MANUAL en de fr es da nl Rev 1 0 2019 W39 2 ...
Page 2: ......
Page 38: ...38 Appendix Week program specification ...
Page 228: ...228 Appendix Schema s ...
Page 229: ......
Page 230: ......
Page 231: ......