3
PLOW INSTALLATION
8VHWKHSDUWVDQGGLDJUDPGUDZLQJVWRDLGLQWKHLQVWDOODWLRQSURFHVVSDJHV
3-IN-1 PLOW
Operator’s Manual
3. Electric switch installation
8QGHUWKHPDQLIROGFRYHUWKHSORZHQGRIWKHZLUH
harness has been pre assembled prior to shipping.
Prior to installing the electric wire harness and switch
WXUQRIIWKHPDFKLQHDQGUHPRYHWKHNH\
&RQQHFWWKHORQJHUPDFKLQHHQGRIWKHZLUHKDUQHVV
WRWKHSUHDVVHPEOHGSORZHQGRIWKHZLUHKDUQHVV
by connecting the electrical connector plug to the
PDWFKLQJSOXJFRQQHFWHGWKURXJKWKHZDOORIWKH
PDQLIROGFRYHU3DUW
5RXWHWKHPDFKLQHKDUQHVVZLUHIURPWKHSOXJRQWKH
PDQLIROGFRYHUXSWKHERRPDUPVRIWKHPDFKLQH
to the cab. Make sure the wire will not be pinched
when the plow is raised, lowered, or hydro turned.
Secure the wire with nylon zip ties as needed (Page
'LDJUDP7RFRQÀUP\RXKDYHDOORZHGWKH
DSSURSULDWHOHQJWKRIZLUHUDLVHWKHSORZDQGUROO
WKHERRPIRUZDUGDVLIGXPSLQJDEXFNHW&RQÀUP
\RXUZLUHOHQJWKIURPWKLVSRVLWLRQWRHQVXUHWKHZLUH
is not pulled or stretched during operation.
Use existing clamps along the boom arm or nylon zip
ties to secure the wire to the boom. Pay particular
DWWHQWLRQWRWKHWUDQVLWLRQSRLQWIURPWKHPDFKLQH
ERG\WRWKHKLQJHVRIWKHERRPDUPV,QWKLVDUHD
EHVXUHWKHZLUHKDUQHVVLVFOHDURIDQ\SLQFKSRLQWV
WKDWPD\EHSUHVHQWZKHQWKHERRPLVOLIWHGDQG
lowered. Also, be sure to allow enough slack that
WKHZLUHKDUQHVVLVQRWEURNHQRUVWUHWFKHGDIWHU
EHLQJVHFXUHGEHFDXVHRIWKHPDFKLQHDUWLFXODWLRQ
or movement between the machine body and the
ERRPDUPV$IWHUWKHPDFKLQHKDUQHVVLVSURSHUO\
VHFXUHGWRWKHERRPRIWKHPDFKLQHGLVFRQQHFWWKH
electrical plug to the pre assembled plow harness at
WKHPDQLIROGFRYHUSULRUWRFRQWLQXLQJWKHHOHFWULFDO
installation process. Cover both connectors with
WKHSURYLGHGFDSVWRSUHYHQWFRQWDPLQDWLRQIURP
entering the electrical system.
'HWHUPLQHDVXLWDEOHORFDWLRQRQWKHPDFKLQHÀUHZDOO
WRSDVVWKHERRPZLUHIURPWKHRXWVLGHRIWKHFDEWR
WKHLQWHULRURIWKHPDFKLQHFDE7KLVPD\SDVVWKURXJK
a boot along the steering column, or through a hole
FRYHUHGIURPWKHIDFWRU\ZLWKDSOXJ,IDKROHPXVW
be drilled, select an area with no obstruction, on either
VLGHDQGGULOODµSLORWKROHWRYHULI\H[DFWORFDWLRQ
EHIRUHGULOOLQJDODUJHUKROHZLWKDKROHVDZ3URYLGH
DERRWRUJURPPHWWRSURWHFWWKHKDUQHVVIURPVKDUS
edges.
Install the black switch box in the cab. Install in a
FRQYHQLHQWORFDWLRQIRUWKHRSHUDWRU,WLVUHFRPPHQGHG
that the switch box be mounted in a location which
OLPLWVWKHDPRXQWRIDUPPRYHPHQWIRUWKHRSHUDWRU
EHWZHHQWKHVZLWFKDQGWKHUGYDOYHFRQWURORIWKH
machine. Use heavy duty two sided tape or a mounting
strap to mount the switch in the desired location.
5RXWHWKHUHPDLQLQJZLUHIURPWKHPDFKLQHKDUQHVV
ZLWKLQWKHFDEIURPZKHUHLWSDVVHVWKURXJKWKHÀUHZDOO
to the installed switch. Keep the wire within the cab
routed behind the dash, wall, and door panels where
possible. Loose, exposed wire that is not properly
secured can be damaged or become tangled with the
RSHUDWRUVIHHWDQGWKHSHGDOV
7KHVKRUWHUOHDGIURPWKHVZLWFKER[VKRXOGEHURXWHG
LQWKHVDPHIDVKLRQDVWKHPDQLIROGOHDGZLWKLQWKH
FDEWRWKHYHKLFOHIXVHSDQHO$WWKHIXVHSDQHOWKH
EODFNSRZHUZLUHFRQQHFWVWRDYROWIXVH6HFXUHWKH
white
ground wire to a ground post or mounting screw
QHDUWKHIXVHSDQHO
:LWKWKHPDFKLQHRIIDQGWKHNH\UHPRYHGFRQQHFW
WKHDOXPLQXPVZLWFKFRQQHFWRUVRIWKHPDFKLQHVLGHRI
WKHZLUHKDUQHVVWRWKHSORZVLGHRIWKHZLUHKDUQHVV
,WLVUHFRPPHQGHGWKDWWKHFRYHUVIRUWKHHOHFWULFDO
connectors are placed in a tool box or compartment
RQWKHPDFKLQHRUZLWKLQWKHFDEIRUVDIHNHHSLQJ
while the plow is installed on the machine. This will also
DOORZIRUHDV\DFFHVVE\WKHRSHUDWRUZKHQWKHSORZLV
UHPRYHGLQRUGHUWRFRYHUWKHHQGVWRNHHSWKHPIUHH
RIFRQWDPLQDWLRQ
Summary of Contents for 844.BLU.PLOW
Page 1: ...3 IN 1 PLOW Operator s Manual 844 BLU PLOW 844 258 7569 www danielsplows com...
Page 10: ...9 7 3 IN 1 PLOW Parts Diagrams...
Page 11: ...10 7 3 IN 1 PLOW Parts Diagrams...
Page 12: ...11 7 3 IN 1 PLOW Parts Diagrams...
Page 13: ...12 3 IN 1 PLOW Parts Diagrams PN17426 PN17428 2019 2018...
Page 14: ...13 3 IN 1 PLOW Parts Diagrams 16 CORRECT CORRECT CORRECT INCORRECT INCORRECT INCORRECT X X X...