
Page
53
of
73
M-AI-VT-001-EN Rev.C.1
Compressor Module Installation
Rigging Requirements
For compressor rigging, two eye bolts are
provided (one at each end). A properly designed
spreader bar should be used to safely position
the compressor into its final location;
see Figure 38.
• Utilize a 454 kg (1 ton) (minimum) hoist to lift
the compressor via a spreader bar with an eye
bolt placed at the center of gravity.
• The spreader bar is attached to the compressor
eye bolts with shackles.
Figure 37
Rigging Set up
Figure 38
Spreader Bar Dimensions
• • • DANGER • • •
Compressor Must NOT be lifted using only one eye bolt. Dual lifting points must be used at all times.
• • • CAUTION • • •
Care must be exercised at all times when rigging or handling the compressor to protect it from damage.
750 (29.52”)
31.2 (1.22”)
167 (6.57”)
520.6 (20.49”)