[39]
Set digital out B high
[40]
Set digital out C high
[41]
Set digital out D high
[42]
Set digital out E high
[43]
Set digital out F high
[60]
Reset Counter A
[61]
Reset Counter B
[70]
Start Timer 3
[71]
Start Timer 4
[72]
Start Timer 5
[73]
Start Timer 6
[74]
Start Timer 7
23-04 Occurrence
Array [10]
Option:
Function:
Select which day(s) the Timed Action applies to. Specify working/non-working days in par.
0-81
[0] *
All days
[1]
Working days
[2]
Non-working days
[3]
Monday
[4]
Tuesday
[5]
Wednesday
[6]
Thursday
[7]
Friday
[8]
Saturday
[9]
Sunday
2.20.2 23-1* Maintenance
Wear and tear calls for periodic inspection and service of elements in the application, e.g. motor bearings, feedback sensors and seals or filters. With
Preventive Maintenance the service intervals may be programmed into the frequency converter. The frequency converter will give a message when
maintenance is required. 20 Preventive Maintenance Events can be programmed into the frequency converter. For each Event the following must be
specified:
•
Maintenance item (e.g. “Motor Bearings”)
•
Maintenance action (e.g. “Replace”)
•
Maintenance Time Base (e.g. “Running Hours” or a specific date and time)
•
Maintenance Time Interval or the date and time of next maintenance
NB!
To disable a Preventive Maintenance Event the associated par.23-12
Disabled
[0].
Preventive Maintenance can be programmed from the LCP, but use of the PC-based VLT Motion Control Tool MCT10 is recommended.