1.  Physical connection of the 

display

The connection can be made using a Danfoss telephone cable (codes 080G0075 and 080G0076), or 

with specific cables at the terminals.

Telephone cable connection:

 It is not necessary to turn on the power separately from the display.

Connect only the telephone cable to the display and the controller and insert the jumpers between 

terminals H and R on both sides, as shown in the figure:

Connection by own cables:

 it is necessary to connect separate power to the display.

Connect the cables to the display and the controller and insert the jumpers between terminals H and 

R on both sides, as shown in the figure: