background image

1

Installation Guide

AB-QM (DN 10-32) Setting tool

Heating Solutions 

VI.BP.G1.00 

SMT/SI

Setting procedure: 

Step 1a.

  Positioning of pre-setting tool 

Setting procedure: 

Step 1b.

  Positioning of pre-setting tool 

Setting procedure: 

Step 2.

  Mounting of lower part (1/2 turn)  

Setting procedure: 

Step 3a.

  Pre-setting (factory setting is 100%)

Position of indicator ring

Button up

Button rotating of desired setting

Button down

Reviews: