background image

4,36x2,95x2,7m

for

Gazebo

Manual

24-02-2021

Summary of Contents for PA152010

Page 1: ...4 36x2 95x2 7m for Gazebo Manual 24 02 2021...

Page 2: ...Assembly Instructions PRODUCT SIZE LxWxH 436x295x270cm PLEASE READ CAREFULLY BEFORE ASSEMBLY...

Page 3: ...TENTS 1 Assembly Advice Page 1 2 Product Features Page 2 3 3 Parts List Page 4 6 6 Base Assembly Page 12 13 7 Framework Glazing Assembly Page 14 31 4 Roof Vent Assembly Page 7 8 5 Door Assembly Page 9...

Page 4: ...of Heavy articles should not be leaned against the greenhouse 5 Keep the roof and gutter clear of snow dirt leaves Allowing snow to build up on the roof may damage the product 6 Unlike steel if the pa...

Page 5: ...connectors make much stronger joints than conventional greenhouses 4 The strong two part eaves beam includes an integral gutter Downpipes are also included as standard so you can collect rainwater St...

Page 6: ...s an inexpensive optional extra 7 POWERED SCREWDRIVER RECOMMENDED This quality greenhouse features self tapping screws to provide strong joints As the name suggests the screws tap their own thread Dri...

Page 7: ...L05A PART NO QTY L01A 4 L18A 2 L18B 2 L17 2 PART NO QTY L03A 4 ALU BoxNo 2 Tools Provided 5 4X16D Z02 267 M4 2X16 Z08 8 D49 A03 2 D52 4 4 D53 D22 18 J93 J92 246 M5X12 S26 26 M5X12 S27 9 M4 8X16 Z17 A0...

Page 8: ...1 L05B L11 2 L15A 2 PART NO QTY L03B 4 6 L03D 10 L05E L03A 9 2 L07B L08B 2 2 L09B L06A 1 2 L03E 1 L18C 1 L18D L05G 4 PART NO QTY PART NO QTY L16A 1 L16B 1 L20 2 ALU BoxNo 3 PA152010 1 4 3 2 5 6 7 8 1...

Page 9: ...NO QTY 160M J107 PART NO QTY 98M J107 Y5 Y5 Y5 Y1 Y3 Y4 Y2 Y5 Y5 Y5 Y5 Y5 Y5 Y5 Y5 Y5 Y1 Y1 Y1 Y3 Y3 Y3 Y4 Y4 Y4 Y6 Y6 Y7 Y7 Y10 Y10 Y11 Y11 Y11 Y11 Y5 Y5 Y5 Y5 Y8 Y8 Y8 4 Y8 Y8 Rubber for walls roof...

Page 10: ...of L19A L19B L20 Insert Part B into the tube of L19A L19B L20 Slot Tube After connector D46 part H43 are in positions make a pencil mark at about 20MM from each end of L19A L19B and L20 Use a powered...

Page 11: ...11 L15A 1 1 2 2 Z02 Z08 2 Z02 Y10 J107 J107 PART NO QTY 2 65M J107 1 2 If glass is chosen please seal it with rubber J107 provided If polycarbonate sheet is chosen rubber is not provided Please seal i...

Page 12: ...G D45 D45 D45 D45 L16B L18D L18A L18B Y11 Y11 S05 M6X12 6 6 M03 M6 L05G 4 S26 L16B 1 Insert Connector D45 into each end of frame profiles L16B L18A L18B L18D and then fix them with screws Z08 Before f...

Page 13: ...Y11 S05 S05 M03 M03 S26 Insert Connector D45into each end of frame profiles L16A L18A L18B L18C and then fix them with screws Z08 Before fixing with screws please mark them with a pencil at distance a...

Page 14: ...11 PART NO QTY 12 2M J107 J107 J107 Y11 If glass is chosen please seal it with rubber J107 provided Rubber is not provided if you choose polycarbonate sheet as glazing panel Noted...

Page 15: ...a b Expansion screw Concrete ground a b a b a b 12 It is essential the dimensions a b are the same to ensure the base is square Steel pegs in soil Support at the corners only is inadequate...

Page 16: ...8 5 1 9 4 M M 352 705 705 705 352 352 705 352 352 352 352 705 705 352 705 705 705 705 705 705 705 Expansion bolts assembly This shows a layout for D22 s positions where it is placedin the middle of th...

Page 17: ...QTY L08A 2 14 J41 4 8 M5X12 S26 L01A L01A L01A L01A L08B 2 J41 J41 J41 J41 L08A L08A L08B L08B L08B J41 L01A L08A Insert J41 into the tube of L08A and L08B Fix L01A to L08A L08B through J41 using S26...

Page 18: ...15 2 L07A 8 M5X12 S26 J39 4 J39 J39 J39 J39 L07A L07A L07B L07B 2 L07B J39 L07B L07A S26 Insert J39 into L01A and then fix L07A L07B to L01A using S26 Make sure the angle is Right Angle before tighti...

Page 19: ...ix a L03A to L08B L07B using S26 Make sure the other side of Y5 is completely in the channel of L03A Insert another Y5 into the channel of L03A then fix another L03A using S26 Do the same for the othe...

Page 20: ...PART NO QTY L03A 6 17 6 24 M5X12 S26 Y5 L07A L08A 2 Y6 L03A L03A S26 S26 Y6 Y6 Y5 Y5 Y5 L03A L03A Side Walls Assembly Do the same as the back wall assembly Y6 is the last panel to insert in...

Page 21: ...05C S26 S26 S26 S26 24 M5X12 S26 4 Y5 L05C L05C L03A 2 Y5 Y5 Y5 Y5 L04A L04B L03A L03A 8 M4 2X16 Z08 Front Wall Assembly Fix L03A and Y5 same as the back wall assembly Fix L04A L04B using S26 And then...

Page 22: ...8 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 1 L05B L05A L05A L05B Install L05A 2PCS L05B Fix two ends of L05A L05B onto L01A using S26 Fix L05A L05B to L03A with the self tapping screws Z08 using a powered screwd...

Page 23: ...E L02E Y6 S26 Z08 D49 L02E L03A Insert the other end of Y6 into the channel of L02E Fix plate D49 onto L02E and L03A using S26 and Z08 as shown above PART NO QTY 2 L02E 8 M4 2X16 Z08 4 D49 M5X12 S26 4...

Page 24: ...o the window profile L11 using S26 2 Make a mark on L03A at distance 593MM from L02E as shown on the left Do the same on the other end 3 Fix the window to L03A using Z08 4 Insert Y7 into the channel o...

Page 25: ...PART NO QTY 6 M4 2X16 Z08 1 D115 1 H59 D115 H59 Z08 D115 Z08 Z08 L02E L02E 22 Fix D115 onto L02E using Z08 and fix the auto opener onto D115 and L19B window profile using Z08 H59 L19B...

Page 26: ...PART NO QTY 80M J107 23 J107 J107 J107 If glass is chosen please seal it with rubber J107 provided...

Page 27: ...A L03D L23A L03D 1 1 1 1 2 2 2 D56 L23A L23A L03D L03D Fix L23A 2PCS and L03D 2PCS to D56 as shown above using S26 Fix the roof profiles L23A to L07A L07B with D52 using S26 Fix L03D to L07A L07B usin...

Page 28: ...2 S26 M5 M05 8 L03E 2 L06A J40 2 L06A L03D L03D L03E L03E S26 J40 J40 J40 L07B L03E S26 L06A L03E L03D S26 L07A 1 2 4 3 5 1 1 2 2 5 5 4 3 3 L06A L03D 1 Fix L06A to L23A L03D with J40 using S26 Fix L03...

Page 29: ...7 J107 J107 Y1 Y2 PART NO QTY 62M J107 L03C L03B Y2 Y1 2 L09B 4 Y8 Insert Y1 Y2 into the right position before fixing L03B L03C 1 1 2 2 1 2 If glass is chosen please seal it with rubber J107 provided...

Page 30: ...4 Y8 Y8 Y3 Y8 Y8 Y4 Put Y3 Y4 and Y8 into positions If glass is chosen please seal it with rubber J107 provided If polycarbonate sheet is chosen rubber is not provided Please seal it with silicone sea...

Page 31: ...it gently into position with a rubber mallet Do the same on the other side Assembly the other 2 sides Firstly put Y1 Y2 into positions and fix L03B L03C to L23A L07A Secondly put panel Y3 Y4 into posi...

Page 32: ...26 L05C L03B L03C S26 2 L05C 2 Z08 L03D 1 112 M4 2X16 Z08 Z08 10 L05E L05E L05E L05E L05E L05E L05E L05A L05A L05C L05C 1 1 1 1 2 2 2 2 2 2 Fix L05A L05C to L03B L03C using S26 and fix it to L03D usin...

Page 33: ...X16 Z17 Left Door Right Door 1 1 L24 A51 4 3 M4 2X16 Z08 Z08 S27 Z17 S27 Z17 Door Assembly Fix L24 to L07B using Z08 Fix L25 4 PCS one side to the door profile and the other side to L04A L04B using S2...

Page 34: ...700mm up from the bottom Fix the J92 downpipe bracket with Z08 screws and then clip the L25 downpipe into the J92 bracket 2 3 4 2 4 3 H10 Z06 Z08 1 Drill the holes on each L03A as shown Dia 3 2mm and...

Page 35: ...I For more information please visit www dancovershop com l l l l l l l l l l l Dancover A S Lyngevej 16A N rre Herlev 3400 Hiller d Denmark Head office...

Reviews: