10
Mechanical Installation
3.3 Assembly Overview
The assembly kit includes the following:
Floor frame – 2 halves, 2 side splice plates, and 4 top & bottom splice plates
Corner shrouds @ 4
Shroud brackets @ 8
Top corner brackets @ 4
Assorted bolts, nuts, washers, and screws
In addition to the scoreboard pieces, an installation may also include:
Upper and lower ad panels
A message center at the top or bottom of the scoreboard
Each scoreboard face section is one piece and must be attached to the structural frame.
The frame is shipped in two parts and requires some assembly. Corner shrouds, which
provide cosmetic covering only, are attached to the display last.
Ad panels may simply be painted metal cabinets that do not need power, or they may be
backlit, requiring a 120 V circuit. An LED message center requires power as well as signal
wiring. The scoreboard itself requires power and signal wiring. The scoreboard tilts outward
at approximately 10°, while the ad panels or message centers are vertical (except for BB-2146
and BB-2147, where the opposite is true). Refer to
Section A-A
shown on the mechanical
specification drawings in
Appendix A
.
3.4 Frame Assembly
Reference Drawing:
Optional 4-Side Canvas Assembly .........................................................
Drawing A-173611
Field Assembly; 8' x 8' Bolted Frame ....................................................
Drawing
B-1101988
Field Assembly; 10' x 10' Bolted Frame ................................................
Drawing
B-1102115
Field Assembly; 10' x 10' SS Bolted Frame ..........................................
Drawing
B-1102140
The scoreboard frame is shipped in two sections (refer to
Drawings B-1101988
and
B-1102115
in
Appendix E
). Note that each section has two corners with a brace across the corner and
two corners without a brace. The lift tubes in the braced corners will be on the top side. An
optional sheet metal floor may be attached to the top side of the frame sections during
manufacturing.
1.
Lay out the two sections with the unbraced sides facing each other and the corner lift
tubes facing up.
2.
Connect the sections together in the middle using
1
/
2
" hardware.
3.
Attach all six section splice plates using
1
/
2
" hardware. Two splice plates will go on
the sides, while two smaller splice plates will go on both the top and bottom.
Note:
If an optional canvas was ordered, attach it to the bottom of the frame using the
provided hook and loop fastener strips and self-drilling screws. Refer to
DWG-
173611
in
Appendix C
for more information on this option.
BB-2146 and BB-2147
For BB-2146 and BB-2147 models, refer to
Drawing B-1102140
. These models include LED
message centers that require additional “kickers” for support.
Summary of Contents for Tuff Sport BB-2102
Page 2: ......
Page 4: ......
Page 10: ......
Page 26: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 56: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Page 60: ......
Page 62: ...PERIOD GUEST HOME HOME PERIOD GUEST B B B B B B ...
Page 64: ...HOME GUEST PERIOD HOME GUEST PERIOD B B B B B B B B ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 104: ......
Page 108: ......
Page 110: ......