background image

(WGA100)

Daintree

®

 General 

Purpose Adapter

BEFORE YOU BEGIN 

Read these instructions completely and carefully.

Save these instructions for future use.

1

Installation Process

Installation Guide 

WGA100  |  DT110

1. Disconnect power before installation.

 Turn off all power 

  to affected light fixtures by turning off circuit breakers.  

 

  Confirm that power is off at all light fixtures before 

  continuing installation.

2.

 Set the WGA100 DIP switches to support the device(s) it will    

  monitor or control. See 

DIP Switch Settings

 (pages 2).

3.

 

IMPORTANT:

 Put the WGA100’s “Plan” label (with 4-5 digits 

  of the IEEE address) on the floor plan to indicate its location.

4.

 Mount the WGA100 to a junction box or enclosure

  approved for the application. See

 Mounting

 (page 7).

5. 

Connect low voltage wiring from the WGA100 to the

  device(s) as appropriate for your application. See 

Wiring

  (pages 3-6).

Risk of electrical shock. Disconnect power before servicing or  

installing product. 

Install in accordance with National Electric Code and local codes.

WARNING

Risk of injury. Wear safety glasses and gloves during installation and 

servicing.

CAUTION

The 

WGA100 Wireless General Purpose Adapter

 forms part of 

the Daintree Networked wireless controls solution for commercial 

and industrial buildings. It transmits and receives messages over 

the wireless ZigBee

®

 network to monitor and control a variety of 

devices used in building management.

The WGA100 is an AC powered device that provides On/Off 

switching and 0-10V analog control as well as reporting and 

monitoring capability of binary and 0-10V analog signal inputs 

for non-lighting applications. It provides power for low voltage 

sensors, switches, and analog control signals and provides the 

wireless adaptation that enables them to communicate with the 

rest of the wireless control solution. The control signals to and 

from these devices pass between the WGA100 and the Wireless 

Area Controller (WAC) in the Daintree Networked platform.

Error/Test 

— On when the Wireless Adapter is in an error state. 

Flashes to indicate unit Reset and during Installation Test Mode (red).

Joined 

— On when the Wireless Adapter has joined a ZigBee

®

 network. 

Flashes to indicate Reset and during sensor Installation Test Mode (green).

Power 

— On when power is applied to the Wireless Adapter (green). 

 

LED Indicators

6.

 Connect line voltage wiring from the supply circuit to

  the WGA100 as described in 

Wiring

 (pages 3-6).

7.

 Check load circuits then turn on the circuit breakers

  to power up the WGA100. Device(s) connected to the

  WGA100 binary outputs [line voltage Switched Load (BO1)

  and 24VDC LSD (B02)] are OFF when power is initially

  applied (and when power is restored after a power failure).

8.

 Ensure the WGA100 green Power        LED is On.

9.

 Press and hold the blue RESET button on the WGA100 for  

  3 seconds to reset the unit. Release the button when the green  

  Joined        LED and the red Error        LEDs begin flashing.

10.

 Perform the installation test appropriate for your application.   

 See 

Installation Tests

 (page 8).

Power

LED

Reset

Button

Joined

LED

Error

LED

Summary of Contents for GE current WGA100

Page 1: ...an AC powered device that provides On Off switching and 0 10V analog control as well as reporting and monitoring capability of binary and 0 10V analog signal inputs for non lighting applications It pr...

Page 2: ...valve or damper actuator An example is a hot water valve opening up 25 to maintain a set point Switch 4 Binary Input Low voltage Blue wire A binary input indicates if a device is turned on or not Some...

Page 3: ...of the devices connected to it Risk of electrical shock Disconnect all power before installation and during servicing Do not open WGA100 enclosure no user serviceable parts inside All installation and...

Page 4: ...Guide Daintree Networked General Purpose Adapter WGA100 4 4 Wiring Continued Figure 5 Switched Line Voltage to Contactor Binary Output DIP Switch 1 On Figure 6 Low Voltage On Off LSD Binary Output DIP...

Page 5: ...General Purpose Adapter WGA100 5 4 Wiring Continued Figure 7 Setback Thermostat Binary Output DIP Switch 2 On Figure 8 Analog Output 0 10V level controllable multistate DIP Switch 3 On Figure 9 Binary...

Page 6: ...Continued Figure 10 Analog Input 0 10V level monitoring multistate DIP Switch 6 On Figure 11 Combination of Interfaces The interfaces can be enabled in any combination DIP Switches 1 3 4 5 and 6 are t...

Page 7: ...ough a knockout When the wiring connections have been decided and extra unused wires identified secure the unused wires to keep them neat out of the way and protected against shorting or interference...

Page 8: ...d IEEE Addresses After the Installation Test is complete the WGA100 is ready to communicate with the Daintree Wireless Area Controller WAC and the Daintree Controls Software DCS web based user interfa...

Page 9: ...red operation CAN ICES 005 B NMB 005 B FCC Warning Message Industry Canada IC Warning Message Input Voltage 120 277VAC 50 60Hz Switched Output 15A 120 277 VAC Relay 1 hp 120 230 VAC Low Voltage 24VDC...

Reviews: