D-EIMWC01308-16EN - 33/40
Prestart System Checklist
Yes
No
N/A
Unit
Visible damages to unit……………………………………………………………………
Unit structural support adequate and level per IM……………..…………………………
Vibration pads installed per IM………………………………………………………..….
Adequate clearances for service and code requirements……………………………….. …
Chilled Water
Piping complete, vent drain, & gauge connections installed………………………………
Piping properly supported and stress free………………………………………………..
Water system flushed, filled, vented, glycol and water treatment applied necessary ........
Pumps installed, (rotation checked), strainers cleaned ......................................................
Controls (3-way, face and bypass dampers, bypass valves, etc.) operable ........................
Water system operated and flow balanced to meet unit design requirements ...................
Condenser Water
Piping complete, vent drain, & gauge connections installed,
Piping properly supported and stress free ..........................................................................
Cooling tower flushed, filled and vented, water treatment complete ................................
Condenser water piping flushed, filled and vented ...........................................................
Pumps installed, (rotation checked), strainers cleaned .....................................................
Controls (3-way, bypass valves, etc.) operable ................................................................
Water system operated and flow balanced to meet unit requirements ..............................
Electrical
All copper conductors connected to unit
……………………………………….………..
220-volt service completed, but not connected to control panel ......................................
Power leads connected to starter; load leads run to compressor ready for
connection when service engineer is on hand for start-up ................................................
(Do not connect starter or compressor terminals)
All interlock wiring complete between control panel and complies with specifications ..
Starter complies with specifications .................................................................................
Pump starters and interlock wired ....................................................................................
Cooling tower fans and controls wired .............................................................................
Wiring complies with National Electrical Code and local codes ......................................
Condenser pump starting relay (CWR) installed and wired .............................................
Miscellaneous
Relief valve piping complete ............................................................................................
Thermometer wells, thermometers, gauges, control wells, controls, etc., installed ..........
BAS control sequences, functions and settings confirmed………………………..............
.
Minimum system load of 80% of machine capacity available for testing
and adjusting controls .......................................................................................................
Note
: The checklist must be completed and sent to the local Daikin service location two weeks prior to
start.