Part 6 Service Diagnosis
5.7 Vacuuming and Dehydration Procedure
CHECK 8
Conduct vacuuming and dehydration in the piping system following the procedure for Normal
vacuuming and dehydration described below.
Furthermore, if moisture may get mixed in the piping system, follow the procedure for Special
vacuuming and dehydration described below.
Normal vacuuming and dehydration
1. Vacuuming and dehydration
Use a vacuum pump that enables vacuuming up to –100.7 kPa (–14.6 psi).
Connect manifold gauges to the service ports of liquid pipe and gas pipe and run the
vacuum pump for a period of two or more hours to conduct evacuation to
–100.7 kPa (–14.6 psi) or less.
If the degree of vacuum does not reach –100.7 kPa (–14.6 psi) or less even though
evacuation is conducted for a period of two hours, moisture will have entered the system or
refrigerant leakage will have been caused. In this case, conduct evacuation for a period of
another one hour.
If the degree of vacuum does not reach –100.7 kPa (–14.6 psi) or less even though
evacuation is conducted for a period of three hours, conduct the leak tests.
2. Leaving in vacuum state
Leave the compressor at the degree of vacuum of –100.7 kPa (–14.6 psi) or less for a period
of one hour or more, and then check to be sure that the vacuum gauge reading does not
rise. (If the reading rises, moisture may have remained in the system or refrigerant leakage
may have been caused.)
3. Additional refrigerant charge
Purge air from the manifold gauge connection hoses, and then charge a necessary amount
of refrigerant.
Special vacuuming and dehydration
Use this procedure if moisture may get into the piping, such as construction during the rainy season
(dew condensation may occur, or rainwater may enter the piping during construction work).
1. Vacuuming and dehydration
Follow the same procedure as that for Normal vacuuming and dehydration described above.
2. Vacuum break
Pressurize with nitrogen gas up to 0.05 MPa (7.3 psi).
3. Vacuuming and dehydration
Conduct vacuuming and dehydration for a period of one hour or more. If the degree of
vacuum does not reach –100.7 kPa (–14.6 psi) or less even though evacuation is conducted
for a period of two hours or more, repeat vacuum break - vacuuming and dehydration.
4. Leaving in vacuum state
Leave the compressor at the degree of vacuum of –100.7 kPa (–14.6 psi) or less for a period
of one hour or more, and then check to be sure that the vacuum gauge reading does not
rise.
5. Additional refrigerant charge
Purge air from the manifold gauge connection hoses, and then charge a necessary amount
of refrigerant.
Summary of Contents for SkyAir RZR-TA Series
Page 1: ...Service Manual Cooling Only 60 Hz Heat Pump 60 Hz RZR TA RZQ TA Series SiUS281811EA...
Page 202: ...SiUS281811EA 196 Part 6 Service Diagnosis 5 15 Fan Motor Connector Check for FTQ TA 311...
Page 323: ...SiUS281811EA Wiring Diagrams Part 7 Appendix 317 RZR18 24TAVJUA RZQ18 24TAVJUA 3D124495...
Page 327: ...SiUS281811EA Wiring Diagrams Part 7 Appendix 321 FHQ18 24 30PVJU FHQ36 42MVJU 3D048116C...
Page 328: ...Wiring Diagrams SiUS281811EA 322 Part 7 Appendix FAQ18 24TAVJU 3D114844B...
Page 329: ...SiUS281811EA Wiring Diagrams Part 7 Appendix 323 FBQ18 24 30 36 42 48PVJU 3D065984J...