background image

Installation manual

22

RXYSQ6TAV1B

VRV IV-S System air conditioner

4P482260-1 – 2017.03

3.2

Possible settings for function C

The noise of level 3< level 2< level 1 (

).

3.3

Possible settings for function D and E

For function D (

) only: the noise of level 

3<

level 2< level 1 (

).

For function E (

) only: the power consumption of

level 1< level 2 < level 3 (

).

4

Push the 

 button and the setting is defined.

5

When the 

 button is pushed again, the operation

starts according to the setting.

Refer to the service manual for more details and for other settings.

Confirmation of the set mode

The following items can be confirmed by setting mode 1 (H1P
led is off)

Check the led indication in the field marked 

.

1

Indication of the present operation state

2

Indication of COOL/HEAT selection setting

3

Indication of low noise operation state 

4

Indication of power consumption limitation setting 

11.4. Test operation

Check the stop valves
Make sure to open the gas and liquid line stop valves.

After installation, perform the test operation.
Unless the test operation is performed, the error code "

U3

" is

shown on the remote controller and the unit cannot be operated.

Performing the test operation

1

To protect the compressor, make sure to turn on the power
supply 6 hours before starting operation.

2

Set to setting mode 1 (H1P led is off) (refer to 

"Setting mode 1"

on page 21

).

3

Press the 

 button for 5 seconds when the unit is at a

standstill. The test operation starts when the H2P led blinks and
the remote controller indicates 

 (test operation) and 

(external control).

It may take 10 minutes to bring the state of refrigerant uniform
before the compressor starts, but that is not a malfunction.
The test operation is automatically carried out in cooling mode
during 15~30 minutes.
Depending on the situation, the refrigerant running sound or the
sound of a magnetic solenoid valve may rise during this
operation.
The following items are automatically checked:
-

Check for incorrect wiring

-

Check if stop valves are open

-

Check of refrigerant charge

-

Automatic judgement of piping length

4

After the test operation (maximum 30 minutes), the unit
automatically stops. Check the operation results by the outdoor
unit led indication.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

OFF

(*)

(*)

This setting = factory setting.

w x

x

x

x

x

x

w x

x

x

x

x c

w x

x

x

x c x

w x

x

x

x c c

H1P

H2P

H3P

H4P

H5P

H6P

H7P

w x

x

x

x

x c

(*)

(*)

This setting = factory setting.

w x

x

x

x c x

w x

x

x c x

x

NOTE

When finished, please mark the settings of function C,
D and E in the "Records" part of the label on the
backside of the front plate.

x

normal

w

abnormal

c

under preparation or under test operation

H1P

H2P

H3P

H4P

H5P

H6P

H7P

x

x w x

x

x

x

1

When set to COOL/HEAT change-over by each individual outdoor 
unit circuit (= factory setting).

2

Indication on master unit when COOL/HEAT change-over is 
carried out by outdoor units connected in multiple system-
combination.

3

Indication on slave unit when COOL/HEAT change-over is carried 
out by outdoor units connected in multiple system-combination

H1P

H2P

H3P

H4P

H5P

H6P

H7P

1

(*)

(*)

This setting = factory setting.

x

x w x

x

x

x

2

x

x

x w x

x

x

3

x

x

x

x w x

x

x

standard operation (= factory setting)

w

 operation

H1P

H2P

H3P

H4P

H5P

H6P

H7P

x

x w x

x

x

x

1

1

2

3

L.N.O.P

1

DEMAND

3

1

2

3

BS3  RETURN

BS3  RETURN

L.N.O.P

L.N.O.P

x

standard operation (= factory setting)

w

 operation

H1P

H2P

H3P

H4P

H5P

H6P

H7P

x

x w x

x

x

x

NOTE

After turning on the power supply, the unit can not be
started until the H2P initialisation led goes off
(maximum 12 minutes).

NOTE

When you want to terminate the test operation,
press the 

 button. The unit will keep

running for 30 seconds and then stops. During
test operation it is impossible to stop the unit with
the remote controller.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

normal

x

x w x

x

x

x

abnormal

x w x

x

x

x

x

Indoor units cannot be checked individually. After the
test operation is finished, check the indoor units
individually via the remote controller. This is possible
for VRV and Sky Air indoor units only.

The led indication changes during this operation, but
that is not abnormal.

Please attach the front plate of the outdoor unit in
order to prevent electric shocks.

DEMAND

DEMAND

BS4  TEST

BS3  RETURN

4PEN482260-1.book  Page 22  Monday, March 20, 2017  8:54 PM

Summary of Contents for RXYSQ-TAV

Page 1: ...INSTALLATION MANUAL RXYSQ6TAV1B VRV IV S System air conditioner 4PEN482260 1 book Page 1 Monday March 20 2017 8 54 PM...

Page 2: ...L1 H 0 L2 1 2 H 1 2 H L2 H L2 H L2 H L2 H L2 H L2 H L2 H 150 500 500 500 500 750 100 100 100 100 200 300 200 100 250 250 500 1000 1000 1000 500 500 500 500 1000 1000 1000 1000 500 500 1000 500 1000 1...

Page 3: ...2 3 4 1 2 3 4 380 415 V V1 Y1 10 16 V 230 V 230 V 16 V 16 V 16 V 1 2 3 2 3 4 1 2 3 4 1 4 5 5 5 380 415 V V1 Y1 11 2 1 1 1 2 3 4 4 V1 1 50 Hz Y1 3N 50 Hz 1 50 Hz 1 8 11 9 8 10 4PEN482260 1 book Page 1...

Page 4: ...B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifikat C 11 Information...

Page 5: ...The English text is the original instruction Other languages are translations of the original instructions 1 SAFETY CONSIDERATIONS The precautions listed here are divided into the following two types...

Page 6: ...tubes are not effective grounds Lightning conductor or telephone ground wire Electric potential may rise abnormally if struck by a lightning bolt Be sure to install an earth leakage breaker Failure to...

Page 7: ...an optimum refrigerant branching kit refer to Refrigerant branch kit selection on page 11 2 5 Technical and electrical specifications Refer to the Engineering Data Book for the complete list of specif...

Page 8: ...e satisfied and that meets with your customer s approval Places which are well ventilated Places where the unit does not bother next door neighbours Safe places which can withstand the unit s weight a...

Page 9: ...evention of falling over If it is necessary to prevent the unit from falling over install as shown in the figure prepare all 4 wires as indicated in the drawing unscrew the top plate at the 4 location...

Page 10: ...H A and L is shown in the table below NOTE If drain holes of the outdoor unit are covered by a mounting base or by floor surface raise the unit in order to provide a free space of more than 100 mm und...

Page 11: ...reat caution is needed when passing copper tubes through walls For handling of stop valves refer to 9 3 How to use the stop valve on page 9 Only use the flare nuts included with the unit Using differe...

Page 12: ...material field supply to stop up all gaps as shown in the figure Insects or small animals entering the outdoor unit may cause a short circuit in the electrical box Pipe size Tightening torque N m A m...

Page 13: ...ul not to let the BP unit and outdoor branch piping come into contact with the compressor terminal cover If the liquid side piping insulation might come into contact with it adjust the height as shown...

Page 14: ...al cover 3 For Sky Air or room air conditioner indoor units only BP unit and outdoor field piping 3 For VRV indoor units only Indoor and outdoor field piping 4 Corking etc 5 Insulation material field...

Page 15: ...Difference in height Difference in height between outdoor and indoor units H1 30 m Between outdoor and BP units Difference in height Difference in height between outdoor and BP units H2 30 m Between...

Page 16: ...c d e Total indoor capacity Q Gas pipe Liquid pipe Qc Qd Qe 5 0 kW 12 7x0 8 6 4x0 8 Qc Qd Qe 5 0 kW 15 9x1 0 9 5x0 8 NOTE Qc Qd Qe is total connected indoor capacity c d e indicates the symbols in th...

Page 17: ...If the recommended pipe size is not available stick to the original pipe diameter which may result in a small capacity decrease Gas side RXYSQ4 5 15 9 19 1 RXYSQ6 19 1 22 2 A Piping between outdoor un...

Page 18: ...tory charged with refrigerant and depending on pipe sizes and pipe lengths some systems require additional charging of refrigerant See How to calculate the additional refrigerant to be charged on page...

Page 19: ...ollows 1 Turn on the power of the outdoor unit 2 Press at least 5 seconds 3 Press 51 times on 4 Press once 5 Press once 6 Press 2 times on The setting for changing from VRV applications to Sky Air or...

Page 20: ...eration stops The operation automatically stops within 30 minutes If the refrigerant charge cannot be finished within 30 minutes repeat step 5 If the operation stops immediately after restart there is...

Page 21: ...in switch has a contact separation of at least 3 mm in all poles Never squeeze bundled cables into a unit Fix cables so that cables do not make contact with the pipes especially on high pressure side...

Page 22: ...urely clamp the cable as shown in figure 12 1 Power 2 Earth leakage breaker 3 Branch switch overcurrent breaker fuse 4 Ground 5 BP unit 1 Power 2 Earth leakage breaker 3 Branch switch overcurrent brea...

Page 23: ...vent outside pressure being exerted on the terminal board Use an appropriate screwdriver for tightening the terminal screws A screwdriver with a small head will strip the head and make proper tighteni...

Page 24: ...nd transmission wiring Use a designated power supply and transmission wiring and make sure that it has been carried out according to the instructions described in this manual according to the wiring d...

Page 25: ...BS1 BS5 3 DIP switches 2 DS1 1 DS1 2 x OFF w ON c blinking For changing the set mode For field setting For field setting For test operation For resetting the address when the wiring is changed or whe...

Page 26: ...ic judgement of piping length 4 After the test operation maximum 30 minutes the unit automatically stops Check the operation results by the outdoor unit led indication H1P H2P H3P H4P H5P H6P H7P OFF...

Page 27: ...mmediately and then energize the heater for a sufficient length of time before restarting the operation Run each indoor unit one at a time and make sure the corresponding outdoor unit is also running...

Page 28: ...y against leakage according to local regulations or standards The following standards may be applicable if local regulations are not available This unit like other air conditioning systems uses R410A...

Page 29: ...tional legislation amount of refrigerant in a single unit system amount of refrigerant with which the system is charged before leaving the factory additional charging amount amount of refrigerant adde...

Page 30: ...4PEN482260 1 book Page 1 Monday March 20 2017 8 54 PM...

Page 31: ...E E E E E 12 A B C 2 2 3 2 4 7 2 9 3 2 3 5 6 1 4 8 3 2 4 3 2 1 6 8 9 7 2 V1 Y1 3 14 A1P A2P A4P X2M X2M F1 F1 F2 F2 TO IN D UNIT C H SELECTOR X2M A C B A4P TO OUT D UNIT F1 F1 F2 A C B F2 TO IN D UNIT...

Page 32: ...4P482260 1 2017 03 Copyright 2017 Daikin 4PEN482260 1 book Page 1 Monday March 20 2017 8 54 PM...

Reviews: