![Daikin RXTA30B2V1B Service Manual Download Page 86](http://html1.mh-extra.com/html/daikin/rxta30b2v1b/rxta30b2v1b_service-manual_4215663086.webp)
4
|
Components
Service manual
86
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
b
a
c
a
High pressure switch S1PH
b
Faston connector
c
High pressure switch pipe
CAUTION
Overheating the pressure switch will damage or destroy it.
5
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
6
Connect the Faston connectors to the high pressure switch.
7
8
Add
refrigerant
to
the
refrigerant
circuit,
see
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
4.7 Humidity sensor
4.7.1 Checking procedures
To perform a power check of the humidity sensor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
144].
2
Turn ON the power of the unit.
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...