4
|
Components
Service manual
103
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
4.10.2 Repair procedures
To correct the wiring from the indoor unit power supply terminal to the indoor unit main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Correct the wiring from the indoor unit power supply terminal to the PCB, see
232].
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
main PCB and continue with the next
procedure.
To remove the indoor unit main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Disconnect all connectors from the indoor unit main PCB.
2
Carefully pull the indoor unit main PCB from the PCB supports.
3
For FTXTA-B, FTXTP-M and ATXTP-M units: Carefully pull the indoor unit main
PCB from the PCB supports.
4
For FTXTM-R units: Carefully click the indoor unit main PCB out of the PCB
retainers.
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...