
Si001353EB
PCBs
Removal Procedure
9
3. PCBs
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the main PCB.
You can remove the main
PCB after you disconnect
the lead wires on the
terminal board without
removing the electrical box.
1
Cut the 3 clamps.
2
Release the harnesses
from the hooks.
3
Disconnect the
connector [S10].
[S10]: filter PCB
4
Disconnect the
connector [HL3].
[HL3]: filter PCB
(R12594)
(R12595)
(R12596)
[S10]
(R12598)
[HL3]