a) Canvas joints must be used between the main unit and the air suction and discharge ducts.
These fittings are designed to inhibit secondary noise resulting from the transmission of
vibrations and operating noise from the main unit to the ducts or to the rest of the building.
b) The speed of the airflow should be taken into account when choosing air suction and distribution
grills in order to keep wind noise to minimum.
Important points
1. The air discharge duct must be thermally insulated.
2. The canvas duct on the inlet side must be set in a metal framework.
3. The air suction and distribution grills should be positioned to take into account the possibility of
short circuits.
4. Static pressure should be checked to ensure that the airflow is within the specified range.
5. The air filter must be easily detachable.
3.2.12 Selection of Location
This unit, both indoor and outdoor, is suitable for installation in a commercial and light industrial
environment. If installed as a household appliance it could cause electromagnetic interference.
The VRV OUTDOOR units should be installed in a location that meets the following requirements:
1. The foundation is strong enough to support the weight of the unit and the floor is flat to prevent
vibration and noise generation.
2. The space around the unit is adequate for servicing and the minimum space for air inlet and air
outlet is available.
(refer to figure 1 and choose one of both possibilities)
Install indoor unit
Connect ducts
Fit inlets and outlets
(V1040)
1. Front side
2. No limit to wall height
3. Suction side
≥
3/8
≥
3/8
≥
3/8
≥
3/4
≥
3/4
≥
7 7/8
≥
2
≥
2
≥
2
≥
7 7/8
≥
15 3/4
≥
15 3/4
≥
2
≥
3/8
B1
B1
≥
11 3/4
A
A
A
A
A
B2
B2
H1
H2
≥
3 7/8
≥
3 7/8
≥
11 3/4
B1
B2
<
If installed as a single unit
>
(Pattern 1)
(Pattern 2)
(Pattern 3)
(Pattern 1)
(Pattern 2)
(Pattern 3)
<
When
installed in serial
>
1
1
2
2
1
3
1
1
1
1
(in.)
H1
≤
59
H1=59+X
H2
≤
19 5/8
H2=19 5/8 + Y
A
≥
19 5/8
A
≥
19 5/8+X/2
B1
≥
11 3/4
B2
≥
3 7/8
B1
≥
11 3/4+Y/2
B2
≥
3 7/8+Y/2
Summary of Contents for REYQ96MTJU
Page 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Page 6: ...Si39 406 iv Table of Contents...
Page 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Page 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Page 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Page 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Page 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Page 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Page 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Page 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Page 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...