20 Technical data
Installation and operation manual
46
REYQ8~20+REMQ5U7Y1B
VRV IV+ heat recovery
4P546222-1B – 2020.10
20.2
Piping diagram: Outdoor unit
Piping diagram: 5~12 HP
a
b
d
e
c
a
Stop valve (liquid)
b
Service port
c
Stop valve (high pressure/low pressure)
d
Stop valve (gas)
e
Charge port