Special Control
SiUS372201EA
155
Part 4 Functions and Control
While in all-room cooling operation → All-room cooling/heating simultaneous operation
While in all-room heating operation or cooling/heating simultaneous operation → All-room cooling
(1) All the indoor units in cooling operation
Using the dual pressure gas pipe as a suction gas
pipe.
(2) Pump-down residual operation
(3) Pre-startup control
Switching between the electronic expansion
valves of branch selector unit.
Required switching time: 30 seconds (switching
control time)
(While switching: The compressor stops operating.)
(4) Startup control
Switching the dual pressure gas pipe from low
pressure to high pressure.
(5) Into heating operation or cooling and heating
simultaneous operation
Each indoor unit
In warm air supply operation under cool air
prevention control (for 3 to 5 minutes).
(1)
In heating operation or cooling and heating
simultaneous operation
Using the dual pressure gas pipe as a suction
gas pipe.
(2)
Pump-down residual operation
(3)
Pre-startup control
Switching between the electronic expansion
valves of branch selector unit.
Required switching time: 2 to 4 minutes
(switching control time)
(While switching: The compressor stops
operating.)
(4)
Startup control
Switching the dual pressure gas pipe from low
pressure to high pressure.
(5)
Into all-unit cooling operation
In cool air supply operation
Suction gas pipe
Dual pressure gas pipe
Cooling
Cooling
Cooling
Cooling
Cooling
Suction gas pipe
Dual pressure gas pipe
Heating
Heating
Heating
Heating
(1)
(2)
(3)
(4)
(5)
(1)
(2)
(3)
(4)
(5)
(1)
(2)
(3)
(4)
(5)
Heating
Liquid
pipe
Liquid
pipe
Suction gas pipe
Dual pressure gas pipe
Liquid
pipe
Suction gas pipe
Dual pressure gas pipe
Heating
Heating
Heating
Heating
Heating
Suction gas pipe
Dual pressure gas pipe
Vent
Vent
Vent
Vent
Vent
Cooling
Cooling
Cooling
Cooling
Suction gas pipe
Dual pressure gas pipe
Cooling
(1)
(2)
(3)
(4)
(5)
(1)
(2)
(3)
(4)
(5)
(1)
(2)
(3)
(4)
(5)
Liquid
pipe
Liquid
pipe
Liquid
pipe
Summary of Contents for REYQ-AATJA
Page 1: ...Service Manual Heat Recovery 60 Hz REYQ AATJA 208 230 V REYQ AAYDA 460 V SiUS372201EA...
Page 465: ...SiUS372201EA Wiring Diagrams Part 7 Appendix 458 BS6 8Q54TVJ 2D089122B...
Page 466: ...Wiring Diagrams SiUS372201EA 459 Part 7 Appendix BS10 12Q54TVJ 2D089121B...
Page 469: ...SiUS372201EA Wiring Diagrams Part 7 Appendix 462 BSF6 8Q54TVJ 2D123905A...
Page 472: ...Wiring Diagrams SiUS372201EA 465 Part 7 Appendix FXZQ05 07 09 12 15 18TAVJU 3D110443A...
Page 476: ...Wiring Diagrams SiUS372201EA 469 Part 7 Appendix FXEQ07 09 12 15 18 24PVJU 3D098557A...
Page 477: ...SiUS372201EA Wiring Diagrams Part 7 Appendix 470 FXDQ07 09 12 18 24MVJU C 3D050501C...
Page 483: ...SiUS372201EA Wiring Diagrams Part 7 Appendix 476 FXHQ12 24 36MVJU 3D048116C...
Page 484: ...Wiring Diagrams SiUS372201EA 477 Part 7 Appendix FXAQ07 09 12 18 24PVJU 3D075354F...
Page 490: ...Wiring Diagrams SiUS372201EA 483 Part 7 Appendix VAM1200GVJU 3D073270D...