ESIE19-06
|
Part 3. Repair
3.2. Unit specific repair procedures
21/01/20
|
Version 1.1
Page 45
Modular L Smart
3.2.1.4. Basic removal - removing doors and central panel
PRELIMINARY ACTIONS
1. Switch off the Daikin unit via the user interface.
2. Switch off the Daikin unit with the field supplied circuit breaker.
PROCEDURE
Removal
1. Loosen the 16 screws of the doors and central panel.
2. Take the doors off.
3. Loosen the 4 drain panel screws.
4. Disconnect the syphon for consedate.
5. Take the central panel off.
Figure 3-4: Removing doors and central panel
Summary of Contents for Modular L Smart
Page 1: ...Service Manual Modular L Smart ESIE19 06 ...
Page 6: ...ESIE19 06 Page 6 21 01 20 Version 1 1 Modular L Smart ...
Page 16: ...ESIE19 06 Part 1 Introduction 1 4 How to use Page 16 21 01 20 Version 1 1 Modular L Smart ...
Page 59: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit 21 01 20 Version 1 1 Page 59 Modular L Smart ...
Page 60: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit Page 60 21 01 20 Version 1 1 Modular L Smart ...