14.3 Mounting the outdoor unit
14.3.1 About mounting the outdoor unit
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
14.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"14.1 Preparing the installation site"
14.3.3 To provide the installation structure
Make sure the unit is installed level on a sufficiently strong base to prevent
vibration and noise.
NOTICE
▪
When the installation height of the unit needs to be increased, do NOT use stands
to only support the corners.
▪
Stands under the unit must be at least 100 mm wide.
NOTICE
The height of the foundation must at least be 150 mm from the floor. In heavy
snowfall areas, this height should be increased up to the average expected snow
level, depending on the installation place and condition.