Indoor Unit
SiBE06-514A
130
Removal Procedure
1.3
Removal of the
Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work
Step
Procedure
Points
1
Set the horizontal
blade in horizontal
position to take out the
front grille toward
yourself.
2
Loosen the setting
screw to remove the
wire clamp.
3
Disconnect the four
connectors of the lead
wire.
Summary of Contents for FVKS25BVMB
Page 10: ...SiBE06 514A List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Page 13: ...List of Functions SiBE06 514A 4 List of Functions ...
Page 19: ...Specifications SiBE06 514A 10 Specifications ...
Page 57: ...Control Specification SiBE06 514A 48 Function and Control ...
Page 85: ...Instruction SiBE06 514A 76 System Configuration ...
Page 133: ...Check SiBE06 514A 124 Service Diagnosis ...
Page 171: ...Others SiBE06 514A 162 Others ...
Page 177: ...Wiring Diagrams SiBE06 514A 168 Appendix ...
Page 181: ...SiBE06 514A iv Index ...