7
|
Piping installation
Installer reference guide
35
CTXA-C(W)(B)(S) + FTXA-C(W)(B)(S)
Daikin room air conditioner
4P518023-15P – 2023.05
7.2.2 Precautions when connecting the refrigerant piping
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"7.1 Preparing refrigerant piping"
DANGER: RISK OF BURNING/SCALDING
NOTICE
▪
Use the flare nut fixed to the unit.
▪
To prevent gas leakage, apply refrigeration oil ONLY to the inside of the flare. Use
refrigeration oil for R32 (FW68DA).
▪
Do NOT reuse joints.
NOTICE
▪
Do NOT use mineral oil on flared part.
▪
NEVER install a drier to this R32 unit to guarantee its lifetime. The drying material
may dissolve and damage the system.
NOTICE
Take the following precautions on refrigerant piping into account:
▪
Avoid anything but the designated refrigerant to get mixed into the refrigerant
cycle (e.g. air).
▪
Only use R32 when adding refrigerant.
▪
Only use installation tools (e.g. manifold gauge set) that are exclusively used for
R32 installations to withstand the pressure and to prevent foreign materials (e.g.
mineral oils and moisture) from mixing into the system.
▪
Install the piping so that the flare is NOT subjected to mechanical stress.
▪
Do NOT leave pipes unattended at the site. If the installation is NOT done within 1
day, protect the piping as described in the following table to prevent dirt, liquid
or dust from entering the piping.
▪
Use caution when passing copper tubes through walls (see figure below).
Unit
Installation period
Protection method
Outdoor unit
>1 month
Pinch the pipe
<1 month
Pinch or tape the pipe
Indoor unit
Regardless of the period
Summary of Contents for FTXA20C2V1BW
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...4P518023 15P 2023 05 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...