
Electrical Box / Swing Motor
Si041553EB
6
Removal Procedure
5. Electrical Box / Swing Motor
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Disconnect the
connecting wire.
The service cover can be
removed without removing
the front grille.
The service cover has no
hook and may fall when the
screw is loosened. Be
careful not to drop the
service cover.
1
Remove the screw, and
then the service cover.
2
3
4
Remove the screw, and
then the wire fixture.
Remove the screw, and
then the conduit holding
the connecting wire.
Remove the 4 screws
of the terminal board
and disconnect the
connecting wire.
Conduit is only for U.S.
models.
2. Remove the electrical
box.
When reassembling, be sure
to insert the earth/ground
wires in the front slit and
green/yellow wire is above
the green wire.
When reassembling, make
sure to pass the green earth/
ground wire behind the heat
exchanger tube (the tube
with the thermistor).
1
2
Remove the 2 screws
and detach the earth/
ground wires.
Release the earth/
ground wires from the
front slit at the top of the
electrical box.
Service cover
(R21502)
Wire fixture
Conduit
Terminal board
Connecting
wire
(R21503)
Electrical
box
Front slit
Earth/ground wire (green/yellow)
Earth/ground wire (green)
(R24272)
Green/yellow
Green
(R24275)