Daikin FLOSTO150 Installation And Operating Instructions Manual Download Page 6

General safety precautions

Installation and operating instructions

6

Daikin FLOSTO150

Hot water storage tank

008.1632099_00 – 03/2019 – EN

Intended use also includes compliance with the maintenance and in-
spection conditions. Replacement parts must at least satisfy the
technical requirements defined by the manufacturer. This is the
case, for example, with original spare parts.

1.2.3

Device installation room

For safe and fault-free operation, the installation location of the hot
water storage tank must fulfil certain criteria. Information on the in-
stallation location for the hot water storage tank can be found in

Chap. 4.1

.

Information on the installation location of other components can be
found in the associated documentation supplied with them.

1.2.4

Electrical installation

▪ Before beginning work on live parts, disconnect them from the

power supply (switch off main switch, remove fuse) and secure
against unintentional restart.

▪ Electrical installations may only be carried out by qualified elec-

trical technicians under observance of the relevant electrical
guidelines and the regulations of the electric utilities company.

▪ For each hard-wired power connection, install a separate discon-

nector system compliant with EN 60335-1 for all-pole disconnec-
tion from the power mains.

▪ Compare the mains voltage indicated on the nameplate with the

supply voltage before connecting to the mains.

1.2.5

Requirements for the filling water

Avoid damage caused by deposits and corrosion: Comply with the
applicable engineering regulations on the prevention of corrosion
products and deposits (VDI 2035, BDH/ZVSHK technical information
"Scale formation").

Measures for desalination, softening or hardness stabilisation are
necessary if the filling and top-up water have a high total hardness
(>3 mmol/l - total of the calcium and magnesium concentrations, cal-
culated as calcium carbonate). 

Minimum requirements regarding the quality of filling and top-up wa-
ter:

▪ Water hardness (calcium and magnesium, calculated as calcium

carbonate): ≤ 3 mmol/l

▪ Conductivity: ≤ 1500 (ideal: ≤ 100) μS/cm

▪ Chloride: ≤ 250 mg/l

▪ Sulphate: ≤ 250 mg/l

▪ pH value (heating water): 6.5 - 8.5

Measures for desalination, softening or hardness stabilisation or
other suitable conditioning measures are necessary to maintain the
required water quality if the filling and top-up water have a high total
hardness or other properties divergent from the minimum require-
ments.

It is recommended to install the DRELECANODEA external current
anode.

Using filling water and top-up water which does not meet the stated
quality requirements can cause a considerably reduced service life
of the device. The responsibility for this lies solely with the operator.

1.2.6

Heating system and sanitary connection

▪ Create a heating system according to the safety requirements of

EN 12828.

▪ The plumbing connection must comply with the requirements of

EN 12897. The requirements of the following must also be ob-
served:

▪ EN 1717 – Protection against pollution of potable water installa-

tions and general requirements of devices to prevent pollution
by backflow

▪ EN 61770 – Electric appliances connected to the water mains –

Avoidance of backsiphonage and failure of hose-sets

▪ EN 806 – Specifications for installations inside buildings con-

veying water for human consumption

▪ and, in addition, the country-specific legislation.

INFORMATION

The domestic water quality must comply with the EU
Guideline 98/83 EC and the regionally-applicable regula-
tions.

The connection of an electric immersion heater or an alternative heat
generator may cause the storage temperature to exceed 60 °C.

▪ Scalding protection (e.g. VTA32 + screw connection set 1") must

therefore be fitted during installation.

▪ Use a pressure reducer if the cold water connection pressure

>6 bar.

1.2.7

Operation

Only operate the hot water storage tank:

▪ After all installation and connection work has been completed.

▪ With fully installed device covers.

▪ With sanitary side pressure reducers installed (max. 6 bar).

▪ With heating side pressure reducers installed (max. 3 bar).

▪ With completely filled storage containers (fill level display).

The specified servicing intervals should be adhered to and inspec-
tion work must be carried out.

Summary of Contents for FLOSTO150

Page 1: ...Installation and operating instructions Hot water storage tank English Installation and operating instructions FLOSTO150 03 2019...

Page 2: ......

Page 3: ...sion heater 9 3 2 2 Circulation brakes 9 3 2 3 Scalding protection 9 3 2 4 Circulation line connection 9 3 2 5 External current anode 9 3 2 6 Storage tank connection kit 9 4 Set up and installation 10...

Page 4: ...t by children without supervision Make up the power supply in accord ance with IEC 60335 1 via a separ ator device which exhibits contact separation in all poles with a contact opening distance that p...

Page 5: ...rform the respective activity and who have participated in advanced training courses re cognised by the relevant competent authority These in clude in particular certified heating engineers quali fied...

Page 6: ...culated as calcium carbonate 3 mmol l Conductivity 1500 ideal 100 S cm Chloride 250 mg l Sulphate 250 mg l pH value heating water 6 5 8 5 Measures for desalination softening or hardness stabilisation...

Page 7: ...s and operating manual to the operator and point out that these documents must be made available at all times and must be stored in the immediate vicinity of the device Document the handover by fillin...

Page 8: ...tion Installation and operating instructions 8 Daikin FLOSTO150 Hot water storage tank 008 1632099_00 03 2019 EN 3 Product description 3 1 Design and components Fig 3 1 View from front Fig 3 2 View fr...

Page 9: ...n brakes To prevent heat loss from the connection pipes when the circulation pump is switched off and during periods when no domestic water is drawn off gravity circulation circulation brakes ZKB set...

Page 10: ...device If there are any questions please contact our Technical Customer Service 4 1 2 Scope of delivery E F Fig 4 1 Scope of delivery Item Designation A Storage tank cladding side panel B Storage tan...

Page 11: ...FLOSTO150 Hot water storage tank 008 1632099_00 03 2019 EN Fig 4 3 Installing the hot water storage tank 4 1 4 Mounting removing the storage tank cladding Mounting the storage tank cladding Fig 4 4 In...

Page 12: ...ccur when legionella protection is active or when the hot water target temperature is set to 60 C Fit scalding protection see Chap 3 2 3 For domestic water pipes observe the stipulations of EN 806 and...

Page 13: ...loss Install the heat insulation in accordance with country specific guidelines The manufacturer recommends an insulation thickness of at least 20 mm 4 3 Filling Topping Up INFORMATION Any optional ac...

Page 14: ...is an electric immersion heater set the required storage water temperature Switch on the mains supply switch on the heat generator Wait for the start phase Only if all points on the checklist can be a...

Page 15: ...Open all water outlets 3 Connect the drain hose to the combined filling and draining valve of the storage tank 4 Open the combined filling and draining valve Fig 6 1 Draining the storage tank 6 2 1 D...

Page 16: ...ment H 1 H 2 H m Heating circuits MAG Diaphragm expansion vessel MIX 3 way mixer with drive motor MK1 Mixer group with high efficiency pump MK2 Mixer group with high efficiency pump PWM regu lated P K...

Page 17: ...ter storage tank 008 1632099_00 03 2019 EN PK SV MAG A2 F Flosto tV1 tR MIX H2 PMI tMI tAU M RoCon M1 H1 MK1 MK2 DHW VS tDHW DS SV CW F B n o C o R M A B AB 3UV DHW 3UVB1 FLS M B A AB tV2 Fig 7 2 Conn...

Page 18: ...ating specialists authorised and recog nised by the energy supply company 8 1 Annual inspection If present Carry out a functional inspection of the electric immersion heater by checking the temperatur...

Page 19: ...from the tank with the narrow side ahead Make sure that no parts can fall into the tank If necessary secure the lid with a cord Fig 8 4 Checking and cleaning the interior of the storage tank 6 Check a...

Page 20: ...tinuous output QD according to DIN 4708 kW 49 Maximum draw off rate for the duration of 10 min on recharging at xx kW TkW 10 C TWW 40 C TSP 60 C l min 20 1 Hot water volume without reheating at a draw...

Page 21: ...illibars m l h Flow rate in litres per hour m l min Flow rate in litres per minute Storage tank charging heat exchanger 1 9 3 Tightening torques Designation Thread size Tightening torque Hydraulic lin...

Page 22: ...10 Notes Installation and operating instructions 22 Daikin FLOSTO150 Hot water storage tank 008 1632099_00 03 2019 EN 10 Notes...

Page 23: ...osal 15 Domestic water pipes 12 Draining the heating circuit 15 E Electric immersion heater 9 14 Electrical installation 6 External current anode 9 I Inspection 18 Installing the hot water storage tan...

Page 24: ...008 1632099_00 03 2019 EN Copyright Daikin...

Reviews: