![Daikin FHA100AVEB8 User Reference Manual Download Page 52](http://html.mh-extra.com/html/daikin/fha100aveb8/fha100aveb8_user-reference-manual_2460428052.webp)
16
|
Unit installation
Installer and user reference guide
52
FHA-A(9)
Split system air conditioner
4P708119-1 – 2022.11
b
a
c
d
≥300
≥2500
(mm)
a
Discharge
b
Suction
c
Obstacle
d
Floor
INFORMATION
Some options may require additional service space. Sees the installation manual of
the used option before installation.
16.2 Mounting the indoor unit
16.2.1 Guidelines when installing the indoor unit
INFORMATION
Optional equipment.
When installing optional equipment, also read the installation
manual of the optional equipment. Depending on the field conditions, it might be
easier to install the optional equipment first.
▪
Ceiling strength
. Check whether the ceiling is strong enough to support the
weight of the unit. If there is a risk, reinforce the ceiling before installing the unit.
-
For existing ceilings, use anchors.
-
For new ceilings, use sunken inserts, sunken anchors or other field supplied
parts.
25~55
b
(mm)
a
d
e
c
a
Ceiling slab
b
Anchor
c
Long nut with turnbuckle
d
Suspended ceiling
e
Suspension bolt
▪
Suspension bolts and unit.
Use M8~M10 suspension bolts for installation. Attach
the hanger bracket to the suspension bolt. Fix it securely using a nut and washer
on the top and bottom of the hanger bracket.
Summary of Contents for FHA100AVEB8
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ...4P708119 1 2022 11 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...