Remove the wooden beams from the unit. 

2

Install vibration mountings in case of an installation where noise
and vibration might be an impediment.

3

Set the unit on a solid and level foundation.

The unit should be installed on a solid base. It is recommended
to fix the unit on a concrete base with anchor bolts.

Fix anchor bolts into the concrete foundation. When finally fixing
the unit by means of these anchor bolts, make sure that the
washers for channel DIN434, and both field supplied rubber
plates and field supplied raw cork or rubber sheets for better
vibration protection, are installed as indicated.

The concrete foundation should approximately be 100 mm higher
than the floor level for ease of plumbing work and better drain.

Make certain that the foundation surface is even and flat.

P

REPARING

CHECKING

 

AND

 

CONNECTING

 

THE

WATER

 

CIRCUIT

The units are equipped with a water inlet and water outlet for connec-
tion to a chilled water circuit. This circuit must be provided by a
licensed technician and must comply with all relevant European and
national regulations.

1

Preparing the unit for connection to the water circuit

A box containing 

 couplings and a filter is delivered

with the unit.

As not to damage the parts of the units during transport, the water
inlet pipe with the flowswitch and the water inlet temperature sensor
and the water outlet pipe with the outlet water temperature sensor,
are not factory mounted.

Connecting the water inlet pipe containing the flowswitch and
inlet water temperature sensor: (not for EWWD120)
The water inlet pipe containing the flowswitch and inlet water
temperature sensor is mounted on the side of the water inlet of
the evaporator(s) and is pre-insulated.

Cut the tie wraps and fix the pipe with the supplied 
couplings to the evaporator inlet(s).

Connecting the water outlet pipe containing the outlet water tem-
perature sensor: (not for EWWD120)
The water outlet pipe containing the outlet water temperature
sensor is mounted on the side of the water outlet of the evapora-
tor and is pre-insulated.

Cut the tie wraps and fix the pipe(s) with the supplied 
couplings to the evaporator outlet(s).

After installation of the water inlet
and outlet pipes and as a general
rule for other units, it is recom-
mended to check the insertion depth
of the water temperature sensors into
the connection pipes prior to operation (see figure). 

1

Anchor bolt

2

Washer

3

Rubber plate

4

Row cork or rubber sheet

5

Ground

6

Concrete floor

7

Ditch

Anchor bolt

Model

A

Size

Qty

180

300

M20x200

4

280

350

M20x200

4

EWWD360~540

350

M20x270

4

NOTE

The measurement tabulated is based on the fact
the base is made in the ground or on a concrete
floor. In case the base is made on a rigid floor, it is
possible to include thickness of concrete floor in
that of the base.

In case a base is made on concrete floor, make
sure to provide a ditch as shown. It is important to
extract drainage regardless of whether a base is
made in the ground or on the concrete floor (ditch-
sewerage).

Ingredient ratio of the concrete is: cement 1, sand
2 and gravel 3. Insert iron bars of Ø10 at every
interval of 300 mm. The edge of the concrete
base should be planed.

>200

>A

100

>100

50

>930

1

2
3+4

5

6

7

1855

>930

808

>2371

If air or dirt gets in the water circuit, problems may occur. 
Therefore, always take into account the following when
connecting the water circuit:

1.

Use clean pipes only.

2.

Hold the pipe end downwards when removing burrs.

3.

Cover the pipe end when inserting it through a wall so that
no dust and dirt enter

1

Water inlet of the evaporator

2

Flowswitch

3

Inlet water sensor

4

Water inlet pipe containing the flowswitch and the water inlet 
temperature sensor

5

 coupling

6

Counter pipe

7

Field water piping circuit

8

Filter

9

Filter end cap

Victaulic

®

1

5

6

7

8

4

3

2

9

5

5

5

Victaulic

®

Victaulic

®

Victaulic

®

 50 mm

Summary of Contents for EWWD120MBYNN

Page 1: ...INSTALLATION MANUAL EWWD120MBYNN EWWD180MBYNN EWWD240MBYNN EWWD280MBYNN EWWD360MBYNN EWWD440MBYNN EWWD500MBYNN EWWD520MBYNN EWWD540MBYNN Packaged water cooled water chillers...

Page 2: ...3 24 V K2P M2P L2 L3 SLAVE 1 F18 K2P F8 F9 74 75 76 77 78 79 N L1 F10 F19 230 V 73 24 V K1P M1P L2 L3 MASTER F20 S1S S6S M K1P F11 F12 74 75 76 77 78 79 S10S M M3P SLAVE 2 M2P SLAVE 1 M1P MASTER R8T L...

Page 3: ...es 04 Richtlijnen zoals geamendeerd 05 Directivas seg n lo enmendado 06 Direttive come da modifica 07 v 08 Directivas conforme altera o em 09 10 Direktiver med senere ndringer 11 Direktiv med f retag...

Page 4: ...10 C Daikin Integrated Chiller Network DICN Liquid line solenoid valve Sight glass with moisture indication Voltage free contacts general operation pumpcontact alarm operation circuit 1 operation circ...

Page 5: ...enerated by the unit does not disturb anyone 5 Ensure that water cannot cause any damage to the location in case it drips out of the unit INSPECTING AND HANDLING THE UNIT At delivery the unit should b...

Page 6: ...d couplings to the evaporator inlet s Connecting the water outlet pipe containing the outlet water tem perature sensor not for EWWD120 The water outlet pipe containing the outlet water temperature sen...

Page 7: ...isted in the table below The filter kit supplied with the unit must be installed in front of the evaporator water inlet by means of the supplied couplings as shown in the figure The filter has holes o...

Page 8: ...ltage free contacts to indicate the status of the unit These voltage free contacts can be wired as described on the wiring diagram The maximum allowable current is 4 A Remote inputs Besides the voltag...

Page 9: ...s EWWD360 540 Specifications of the cable 6 ray telephone cable with a maximum cable resistance of 0 1 m 2 For units in a DICN configuration the digital controllers of the units can be installed remot...

Page 10: ...ist is filled out completely tick when checked standard steps to go through before starting the unit 1 Check for external damage 2 Open all shut off valves indicated by a red label OPEN THIS VALVE BEF...

Page 11: ...certain measured temperatures inlet water evaporator temperature and mixed outlet water evaporator temperature This in order to correct a possible measurement fault The default value of the probe off...

Page 12: ...all units the pump runs for a time indicated by the setting Slave 3 S3 is configured to operate when its remote start stop switch S6S S3 is pushed by the operator Slave 1 S1 slave 2 S2 and the master...

Page 13: ...shows the system configuration field wiring and terminals for field wiring of this example Purpose Purpose of this system is to keep a buffer at a constant temperature and to feed a load from this bu...

Page 14: ...Installation manual 11 EWWD120 540MBYNN Packaged water cooled water chillers 4PW22684 1A NOTES...

Page 15: ...circuit The operation of the water chiller is then controlled by the Digital Display Controller Shut down by switching off the controller and the circuit breaker of the power circuit WARNINGS Emergen...

Page 16: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW22684 1A...

Reviews: