
D
–EIMAC01905-23_00EN - 14/53
2
RECEIVING THE UNIT
Inspect the unit immediately after delivery. Make sure that the machine is intact in all its parts and that there are no
deformations due to impacts. All components described in the delivery note must be inspected and checked.
Should any damage occur upon receipt of the machine, do not remove the damaged material and immediately make a
written complaint to the transport company, requesting the inspection of the unit; do not repair until inspection by the
transport company representative is carried out. Immediately report the damage to the manufacturer representative, a set
of photographs is helpful in recognizing responsibility.
Unit restitution is intended as ex-factory Daikin Applied Europe S.p.A.
Daikin Applied Europe S.p.A. declines all responsibility for any damage that the machine may suffer during transport to the
destination.
Use extreme caution when handling the unit to prevent damage to components.
Before installing the unit, check that the model and power supply voltage shown on the nameplate are correct.
Responsibility for any damage after acceptance of the unit cannot be attributed to the manufacturer.