Functional Description
ESIE-0303
2–10
Part 2 – Functional Description
3
1
2
4
5
1.8
Freeze-up Control
Functional
description
The freeze-up control is a protection against ice formation in the water circuit at the evaporator outlet.
Characteristics
The table below contains the characteristics of the freeze-up protection.
Characteristics for
glycol option
The table below contains the characteristics of the freeze-up protection for glycol option.
Characteristics
Freeze-up protection
Control device
Sensor
Diagram name
R4T
Activation
Outlet water temperature. < 4°C
Result: The circuit is disabled.
Reset
Manually on the controller if temperature > 7.5°C
(°C + anti-freeze hysteresis).
Result: The circuit restarts.
ZL
Activation
Outlet water temperature < -11.5°C
Reset
Manually on controller if temperature > 8°C
(-11.5°C + anti-freeze hysteresis).
ZH
Activation
Outlet water temperature < -6.5°C
Reset
Manually on the controller if temperature > 3°C
(-6.5°C + anti-freeze hysteresis).
Summary of Contents for EUWL KZW1 Series
Page 1: ......
Page 2: ......
Page 8: ...Introduction ESIE 0303 vi 3 1 4 5 ...
Page 10: ...ESIE 0303 1 2 Part 1 System Outline 3 1 1 5 ...
Page 50: ...Piping Layout ESIE 0303 1 42 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...Wiring Layout ESIE 0303 1 52 Part 1 System Outline 3 1 1 4 5 ...
Page 61: ...ESIE 0302 Wiring Layout Part 1 System Outline 1 53 3 6 Wiring Diagram Wiring diagram ...
Page 62: ...Wiring Layout ESIE 0302 1 54 Part 1 System Outline ...
Page 64: ...ESIE 0303 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 84: ...ESIE 0303 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 87: ...ESIE 0303 Inputs and Outputs Overview Part 3 Troubleshooting 3 5 3 3 4 5 1 ...
Page 88: ...Inputs and Outputs Overview ESIE 0303 3 6 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 94: ...Malfunction Indications and Safeties Overview ESIE 0303 3 12 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 100: ...Checking the Inputs and Outputs ESIE 0303 3 18 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 112: ...Troubleshooting ESIE 0303 3 30 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 114: ...ESIE 0303 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 130: ...ESIE 0303 5 2 Part 5 Maintenance 3 1 5 ...
Page 139: ...ESIE 0303 Index 3 3 4 5 1 Wiring Diagram k 1 53 ...
Page 140: ...ESIE 0303 4 Index 3 1 4 5 ...