Piping Layout
ESIE11-02
1–60
3
11
4
5
2.2
Installation outline
Introduction
The installation outline contains the main parts of a typical installation:
■
Chiller
■
Primary water circuit
■
Secondary water circuit.
Typical installation
The illustration below shows a typical installation. Some of these components may not be present in
all the chillers described in this manual.
Components
The table below lists the components.
Water filter
Make sure a filter is installed in front of the water inlet of the plate-heat exchanger. The plate-heat
exchangers are sensitive to dirt and small particles.
The mesh opening of the filter is max. 0.5 mm.
T1
P1
T2
P2
3
2
6
6
4
5
1
15
10
13
14
12
8
8
7
11
9
9
11
16
Chiller
Secondary water circuit
Primary water circuit
No.
Chiller
No.
Primary water circuit
1
Compressor
9
Pressure measuring points
2
Air-heat exchanger
10
Flow switch
3
Expansion valve
11
Shut-off valves
4
Water-heat exchanger
12
Buffer tank
5
Fan motor
13
Water filter
6
Refrigerant filter strainer
14
Water pump
7
Water connections
15
Drain valve
8
Temperature measuring points
16
Expansion tank
Summary of Contents for EUWAB10KBZW1
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...