Periodical Checks
Electrical checks
The table below contains the electrical checks.
Refrigerant checks
The table below contains the refrigerant checks.
Water checks
The table below contains the water checks.
Inspection checks and actions
Remarks
Check that all electrical wiring is properly
connected and securely tightened.
—
Check the electrical components for damage or loss.
—
Check if the power supply corresponds with the
identification label of the unit.
—
Check the operation of the circuit breaker and the
earth leak detector of the local supply panel.
—
Check the operation of the safety devices.
No operation can cause damage of the
unit.
Inspection checks and actions
Remarks
Check the refrigerant circuit.
■
If the unit leaks, contact your dealer.
—
Inspection checks and actions
Remarks
Check the water condition.
■
Drain the water from the air release plug.
■
If the water is dirty, replace all the water in the
system.
Dirty water causes a cooling capacity drop
as well as corrosion of the water heat
exchanger and pipe.
Check the water connection.
—
Check the water velocity.
—
Check the function of the flow switch.
The evaporator can freeze up if the flow
switch is not able to operate.
Make sure that there is no air mixed in the water
pipes.
Even if air is removed at the beginning, air
can sometimes enter later. Bleed there-
fore the system regularly.
Check the water filter.
—
Summary of Contents for EUWAB10KBZW1
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...