![Daikin EUWAB10KBZW1 Service Manual Download Page 145](http://html1.mh-extra.com/html/daikin/euwab10kbzw1/euwab10kbzw1_service-manual_501633145.webp)
ESIE11-02
Checking the Inputs and Outputs
3–17
3
3
4
5
1
3.5
Checking the Digital Inputs and Outputs
Troubleshooting
In most cases a malfunction occurs in the unit itself and not in the control circuit of the unit. However,
if a malfunction does occur in the control circuit, measure the relevant signals using the schematic
input route shown below.
Input route to PCB
The block diagram below shows the digital input route from the transducer (e.g. thermostat,
pressostat, reverse phase, etc.) to the PCB input.
Output route from
PCB
The output is generated by the PCB. If a device does not operate, you should find the relevant output
signal from the PCB in order to decide whether the PCB or the device needs replacement.
The block diagram below shows the output route.
Unit
Transducer
Relay
Relay contact
PCB input
Voltage free
contact
230 V (coil)
Voltage free
contact
24 V AC
PCB output
Control relay
Voltage free
contact
230 V (supply)
E.g. fan, valve...
Device
Summary of Contents for EUWAB10KBZW1
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...