
Maintenance
ESIE-0303
5–4
3
1
5
5
1.2
Maintenance of the Main Parts
Preventive
maintenance
A program of scheduled maintenance should be set up and followed. The items mentioned are to be
used as a guide and must be used in combination with sound electrical and refrigeration workmanship
to ensure trouble free operation and performance.
Unit Casing
Follow the below instructions to check the unit casing.
Compressor
Follow the instructions below to check the compressor:
■
Check crankcase heater operation. Switch of the compressor and carefully touch the crankcase
heater area by hand.
No operation can cause compressor damage when the ambient temperature reaches a low
temperature.
Evaporator and
condenser
Follow the instructions below to check the evaporator and condenser:
■
Inspect the evaporator tubes or condenser plates after the first operating season. This condition
indicates the required frequency of cleaning and also whether water treatment is needed in the
chilled water circuit.
■
Check the air plugs and drain plugs to prevent or detect water leakage.
■
Check pressure-drop and water flow.
■
Record temperature difference between in / out and water out/ refrigerant temperature.
■
Inspect evaporator insulation. If damaged, repair to avoid water between insulation and evaporator
shell.
■
Inspect water and refrigerant connections.
■
Brush cleaning. Abnormal high condensing-pressures are an indication for periodic cleaning.
Unit switchbox
Follow the instructions below to check the unit switchbox:
■
Check all power connections for tightness.
■
Check compressor motor terminals.
■
Inspect wiring for any signs of overheating (discolouring).
■
Remove all dust and debris from the switchbox. Replaced coils and components should not be left
in the unit control panel.
■
Check all field-wired terminals.
Check if...
If not, then...
The paint of the unit casing is
intact.
Touch-up with paint.
All plate work is screwed down in
position.
Screw the plate work down in position.
Summary of Contents for EUW KZW1 Series
Page 1: ......
Page 2: ......
Page 8: ...Introduction ESIE 0303 vi 3 1 4 5...
Page 10: ...ESIE 0303 1 2 Part 1 System Outline 3 1 1 5...
Page 50: ...Piping Layout ESIE 0303 1 42 Part 1 System Outline 3 1 1 4 5...
Page 60: ...Wiring Layout ESIE 0303 1 52 Part 1 System Outline 3 1 1 4 5...
Page 61: ...ESIE 0302 Wiring Layout Part 1 System Outline 1 53 3 6 Wiring Diagram Wiring diagram...
Page 62: ...Wiring Layout ESIE 0302 1 54 Part 1 System Outline...
Page 64: ...ESIE 0303 2 2 Part 2 Functional Description 3 1 2 5...
Page 84: ...ESIE 0303 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 87: ...ESIE 0303 Inputs and Outputs Overview Part 3 Troubleshooting 3 5 3 3 4 5 1...
Page 88: ...Inputs and Outputs Overview ESIE 0303 3 6 Part 3 Troubleshooting 3 1 3 4 5...
Page 94: ...Malfunction Indications and Safeties Overview ESIE 0303 3 12 Part 3 Troubleshooting 3 1 3 4 5...
Page 100: ...Checking the Inputs and Outputs ESIE 0303 3 18 Part 3 Troubleshooting 3 1 3 4 5...
Page 112: ...Troubleshooting ESIE 0303 3 30 Part 3 Troubleshooting 3 1 3 4 5...
Page 114: ...ESIE 0303 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 130: ...ESIE 0303 5 2 Part 5 Maintenance 3 1 5...
Page 139: ...ESIE 0303 Index 3 3 4 5 1 Wiring Diagram k 1 53...
Page 140: ...ESIE 0303 4 Index 3 1 4 5...