2
|
General safety precautions
Installer reference guide
13
EPRA14~18D + ET23E
Daikin Altherma 3 H HT F
4P644739-1A – 2022.03
If
Then
A siphon tube is NOT present
Charge with the cylinder upside down.
▪
Open refrigerant cylinders slowly.
▪
Charge the refrigerant in liquid form. Adding it in gas form may prevent normal
operation.
CAUTION
When the refrigerant charging procedure is done or when pausing, close the valve of
the refrigerant tank immediately. If the valve is NOT closed immediately, remaining
pressure might charge additional refrigerant.
Possible consequence:
Incorrect
refrigerant amount.
2.1.4 Water
If applicable. See the installation manual or installer reference guide of your
application for more information.
NOTICE
Make sure water quality complies with EU directive 2020/2184.
2.1.5 Electrical
DANGER: RISK OF ELECTROCUTION
▪
Turn OFF all power supply before removing the switch box cover, connecting
electrical wiring or touching electrical parts.
▪
Disconnect the power supply for more than 10 minutes, and measure the voltage
at the terminals of main circuit capacitors or electrical components before
servicing. The voltage MUST be less than 50 V DC before you can touch electrical
components. For the location of the terminals, see the wiring diagram.
▪
Do NOT touch electrical components with wet hands.
▪
Do NOT leave the unit unattended when the service cover is removed.
WARNING
If NOT factory installed, a main switch or other means for disconnection, having a
contact separation in all poles providing full disconnection under overvoltage
category III condition, MUST be installed in the fixed wiring.
Summary of Contents for ETVZ16E6V7
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ...4P644739 1A 2022 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...