11
|
Commissioning
Installer reference guide
243
EPRA14~18D + ETSH/X(B)16P30+50E
Daikin Altherma 3 H HT ECH₂O
4P679467-1C – 2023.07
INFORMATION
If the outdoor temperature is outside the range of operation, the unit may NOT
operate or may NOT deliver the required capacity.
To monitor leaving water and tank temperatures
During test run, the correct operation of the unit can be checked by monitoring its
leaving water temperature (heating/cooling mode) and tank temperature
(domestic hot water mode).
To monitor the temperatures:
1
In the menu, go to
Sensors
.
2
Select the temperature information.
11.4.4 Actuator test run
Purpose
Perform an actuator test run to confirm the operation of the different actuators.
For example, when you select
Pump
, a test run of the pump will start.
To perform an actuator test run
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to Installer. See
143].
—
2
Go to [A.2]:
Commissioning
>
Actuator test run
.
3
Select a test from the list.
Example:
Pump
.
4
Select
OK
to confirm.
Result:
The actuator test run starts. It stops automatically when
ready (±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.
Possible actuator test runs
NOTICE
For the backup heater test run, make sure that at least one of the two mixing valves
of the unit is open during the test. Otherwise the thermal cut-out of the backup
heater may be triggered.
▪
Backup heater 1
test
▪
Backup heater 2
test
▪
Pump
test
INFORMATION
Make sure that all air is purged before executing the test run. Also avoid disturbances
in the water circuit during the test run.
▪
Shut off valve
test
Summary of Contents for ETSXB16E
Page 313: ......
Page 314: ......
Page 315: ......
Page 316: ...4P679467 1C 2023 07 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...