Electrical installation
Installer reference guide
134
ERLA11~16D + EBVH16SU23D
Daikin Altherma 3 R F
4P655196-1A – 2022.05
[2.D]
Shut off valve
1
"7.2.4 To open the indoor unit"
79]):
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
A
M2S
B
A
B
21 28
X2M
B
21 29
X2M
NO
NC
3
Fix the cable with cable ties to the cable tie mountings.
9.3.4 To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A]
Energy metering