7
|
Unit installation
Installer reference guide
75
EPRA08~W1 + ETVH/9W
Daikin Altherma 3 H MT F
4P634886-1 – 2021.03
NOTICE
Provide at least 150 mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100 mm above the expected level of snow.
Use the drain plug (with O-ring) and a hose for drainage.
1
2
a
b
c
c
3
d
a
Drain hole
b
O-ring (delivered as accessory)
c
Drain plug (delivered as accessory)
d
Hose (field supply)
NOTICE
O-ring.
Make sure the O-ring is installed correctly to prevent leakage.
7.3.6 To install the discharge grille
INFORMATION
Electrical wiring.
Before installing the discharge grille, connect the electrical wiring.
Install the lower part of the discharge grille
1
Insert the hooks.
2
Insert the ball studs.
Summary of Contents for EPRA08EAV3
Page 289: ...13 13...
Page 290: ......
Page 291: ......
Page 292: ...4P634886 1 2021 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...