9
|
Electrical installation
Installer reference guide
121
EPRA08~W1 + ETVH/9W
Daikin Altherma 3 H MT F
4P634886-1 – 2021.03
A
Y2
7
B
A
B
7 9
X2M
A4P
Y2
YC
X1M
a
b
a
Installation of EKRP1HBAA is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT
change.
3
Fix the cable with cable ties to the cable tie mountings.
9.3.8 To connect the changeover to external heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
Open the following (see
"7.2.5 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
Summary of Contents for EPRA08EAV3
Page 289: ...13 13...
Page 290: ......
Page 291: ......
Page 292: ...4P634886 1 2021 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...