10 Commissioning

Installation manual

10

FTXJ35MV1BS/W6

Split system air conditioners

3P482320-15Z – 2021.10

Address jumper

Address

After cutting with nippers

2

INFORMATION

If the setting could NOT be completed while the operation
lamp  was  blinking,  repeat  the  setting  process  from  the
beginning.

7

When the setting is complete, keep 

 pressed for at least

5 seconds.

Result: 

 The user interface will return to the previous screen.

10

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

10.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

The 

outdoor unit

 is properly mounted.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The indoor unit receives the signals of the 

user interface

.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

10.2

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

10.2.1

To perform a test run using the user
interface

1

Press 

 to switch the system on.

2

Press 

 and 

 simultaneously.

3

Press 

, select 

and press 

.

Result: 

Test  run  operation  will  stop  automatically  after  about

30 minutes.

4

To stop operation sooner, press 

.

11

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

12

Technical data

▪ A 

subset

  of  the  latest  technical  data  is  available  on  the  regional

Daikin website (publicly accessible).

▪ The 

full  set

  of  latest  technical  data  is  available  on  the  Daikin

Business Portal (authentication required).

12.1

Wiring diagram

The wiring diagram is delivered with the unit, located inside of
the outdoor unit (bottom side of the top plate).

Summary of Contents for Emura FTXJ-MW

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners FTXJ35MV1BW6 FTXJ35MV1BS6...

Page 2: ...al data 10 12 1 Wiring diagram 10 12 1 1 Unified wiring diagram legend 11 1 About the documentation 1 1 About this document INFORMATION Make sure that the user has the printed documentation and ask hi...

Page 3: ...N phase equipment might break down Establish proper earthing Do NOT earth the unit to a utility pipe surge absorber or telephone earth Incomplete earthing may cause electrical shock Install the requi...

Page 4: ...he latest version of this manual visit app daikineurope com INFORMATION Daikin Industries Czech Republic s r o declares that the radio equipment type inside of this unit is in compliance with Directiv...

Page 5: ...4 25L screws field supply INFORMATION The removed pipe port cover can be kept in the mounting plate pocket mm 998 357 135 142 348 160 151 65 6 5 49 100 200 124 303 49 50 203 234 67 a f b c d e h g a R...

Page 6: ...the piping on left side left back or left bottom INFORMATION The factory default is right side piping For left side piping remove the piping from the right side and install it on the left side 1 Remov...

Page 7: ...temperature is higher than 30 C and the humidity is higher than RH 80 the thickness of the insulation materials should be at least 20 mm to prevent condensation on the surface of the insulation 6 2 Co...

Page 8: ...t least 50 mm WARNING Provide adequate measures to prevent that the unit can be used as a shelter by small animals Small animals that make contact with electrical parts can cause malfunctions smoke or...

Page 9: ...bottom frame of the unit with both hands to set it on the bottom hooks of the mounting plate Make sure that the wires do NOT get squeezed anywhere Note Take care that the interconnection cable does N...

Page 10: ...ecified wires are used for the interconnection cable The indoor unit receives the signals of the user interface There are NO loose connections or damaged electrical components in the switch box The in...

Page 11: ...diode HAP Light emitting diode service monitor green HIGH VOLTAGE High voltage IES Intelligent eye sensor IPM Intelligent power module K R KCR KFR KHuR K M Magnetic relay L Live L Coil L R Reactor Sym...

Page 12: ...suyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe stanbul T RK YE Factory Kargal hanbaba OSB Mahallesi Organize Sanayi 1 Sokak No 28 54300 Hendek Sakarya T RK YE 3P482320 15Z 2021 10...

Reviews: