Daikin EKHTSU200AA Installation Manual Download Page 13

EK260AA + EKUHWHTA

Domestic hot water tank with UK kit for air to water heat pump system

4PW53247-1B

Installation manual

11

Symptom 4: Continuous water discharge

D

IPOSAL

 

REQUIREMENTS

Dismantling of the unit and treatment of parts must be done in
accordance with relevant local and national legislation.

T

ECHNICAL

 

SPECIFICATIONS

Domestic hot water tank specifications

N

OTES

P

OSSIBLE

 

CAUSES

C

ORRECTIVE

 

ACTION

Cold water inlet pressure.

Check the pressure reducing valve. 
Replace the pressure reducing valve 
if the measured pressure is >2.1 bar. 

Temperature and pressure relief 
valve.

Check and reset button.

The expansion relief valve is not 
functioning properly.

Check for correct operation of the 
pressure relief valve by turning the 
red knob on the valve counter 
clockwise:

• If you do not hear a clacking 

sound, contact your local dealer.

• In case the water keeps running 

out of the unit, close both the 
water inlet and outlet shut-off 
valves first and then contact your 
local dealer.

EKHTSU200AA

EKHTSU260AA

• Storage capacity

(l)

200

260

• Material

Stainless steel

Stainless steel

• Overall dimensions (h x l x w)

(mm)

1335 x 600 x 695 1610 x 600 x 695

• Operating pressure

(bar)

2.1

2.1

• Maximum primary working 

pressure (heating side)

(bar)

3

3

• Expansion vessel pre-charge 

pressure

(bar)

2.5

2.5

• Preset opening pressure of 

expansion relief valve

(bar)

8

8

• Preset opening temperature of 

temperature and pressure 
relief valve

(°C)

90~95

90~95

• Set opening pressure of 

temperature and pressure 
relief valve

(bar)

10

10

• Connections

Quick coupling/

G3/4” F

Quick coupling/

G3/4” F

• Inspection access type

G1/2” M 

Recirculation 

connection

G1/2” M 

Recirculation 

connection

• Weight

- empty

(kg)

70

78

- when full

(kg)

265

330

• Mounting

On top of 

EKHBRD or floor 

mounted

On top of 

EKHBRD or floor 

mounted

• Maximum water supply 

pressure

(bar)

8

8

• Supply temperature time

(a)

(a) The time it takes to increase the temperature from 15°C to 60°C

- EKHBRD011

(min)

60

70

- EKHBRD014

(min)

50

60

- EKHBRD016

(min)

40

50

• Re-heat time

(b)

(b) The time it takes to increase 70% of the contents of the vessel back up to 60°C

- EKHBRD011

(min)

50

60

- EKHBRD014

(min)

40

50

- EKHBRD016

(min)

30

40

Summary of Contents for EKHTSU200AA

Page 1: ...INSTALLATION MANUAL EKHTSU200AA EKHTSU260AA EKUHWHTA Domestic hot water tank with UK kit for air to water heat pump system...

Page 2: ...5x 1x 1x 1x 1 3 6 7 5 2 4 1x 340 mm 11 10 12 12 13 2 1 5 4 6 8 3 9 1 2 7 772 902 1032 H 120 6 0 1156 778 653 694 443 600 300 5 B C 250 250 A 600 30 D 30 2x 8 9 6 1 2 1 2 5 9 3 5 9 3 7 6 10 10 4 10 4...

Page 3: ...ct to building regulation approval notify Local Authority of intention to install The EKHTSU domestic hot water tank can only be connected to a EKHBRD indoor unit The domestic hot water tank is availa...

Page 4: ...oupler 22 mm 15 mm 5 Expansion vessel of 18 litres 6 Tundish 7 Elbow Drain valve 22 mm x 3 4 Male BSP 8 Adaptor 22 mm x 3 4 Female BSP 9 T piece 22 mm x 22 mm x 22 mm 10 Instruction sheet 1x 1x 1x 1x...

Page 5: ...before opening the decoration panels of the indoor unit NOTE Refer to Installation of the EKUHWHTA kit on the domestic hot water tank on page 8 for connection of other safety devices in accordance wi...

Page 6: ...itch the panel Mount the top plate of the indoor unit on the domestic hot water tank module 4 Connect the 3 way valve 1 Remove drain plate on top of the indoor unit before installing the 3 way valve 2...

Page 7: ...ifted slightly manual operation is possible 8 Make sure to firmly fix the power supply cord onto the 3 way valve body with a field supplied cable tie like in illustration below 9 Perform the wiring in...

Page 8: ...t water tank on page 8 10 Connect the thermistor wire to the indoor unit switch box Make sure power supply is switched off Refer to the wiring diagram delivered with the indoor unit The distance betwe...

Page 9: ...re and pressure relief valve to ensure free water flow through the discharge pipe turn knob left Refer to Main components on page 2 for location of the temperature and pressure relief valve 13 Reattac...

Page 10: ...pipework All pipework must have a continuous fall Sizing of copper discharge pipe D2 for common temperature relief valve outlet sizes All pipework and fittings must be flushed free of all flux and de...

Page 11: ...ne strainer and the expansion relief valve parts 1 and 2 of this kit see also procedure step 2 as high as possible and connect it to the water mains inlet The expansion relief valve must be installed...

Page 12: ...sing and correcting certain troubles which may occur in the unit General guidelines Before starting the trouble shooting procedure carry out a thorough visual inspection of the unit and look for obvio...

Page 13: ...then contact your local dealer EKHTSU200AA EKHTSU260AA Storage capacity l 200 260 Material Stainless steel Stainless steel Overall dimensions h x l x w mm 1335 x 600 x 695 1610 x 600 x 695 Operating...

Page 14: ...4PW53247 1B Copyright Daikin...

Reviews: