7
|
Unit installation
Installer reference guide
55
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1B – 2021.10
1×
1
1
2
7.2.4 To open the indoor unit
Overview
a
b
d
c e
a
Top panel
b
Upper front panel
c
Switch box cover
d
Front panel
e
High voltage switch box cover
Open
1
Remove the top panel.
7×
T25
2
Remove the upper front panel. Open the hinges at the top and slide the top
panel upwards.