12
|
Commissioning
Installer reference guide
227
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
7
To stop the air purge manually:
—
1
Open the menu and go to
Stop air purge
.
2
Select
OK
to confirm.
To perform an automatic air purge
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to
Installer
. See
124].
—
2
Go to [A.3]:
Commissioning
>
Air purge
.
3
In the menu, set
Type
=
Automatic
.
4
Select
Start air purge
.
5
Select
OK
to confirm.
Result:
The air purge starts. It stops automatically when done.
6
To stop the air purge manually:
—
1
In the menu, go to
Stop air purge
.
2
Select
OK
to confirm.
12.4.3 Operation test run
Purpose
Perform test runs on the unit and monitor the leaving water and tank
temperatures to check if the unit is working correctly. The following test runs
should be made:
▪
Heating
▪
Cooling (if applicable)
▪
Tank
To perform an operation test run
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to
Installer
. See
124].
—
2
Go to [A.1]:
Commissioning
>
Operation test run
.
3
Select a test from the list.
Example:
Heating
.
4
Select
OK
to confirm.
Result:
The test run starts. It stops automatically when ready
(±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.