
9
|
Electrical installation
Installer reference guide
113
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
9.2.8 To connect the domestic hot water pump
Wires: (2+GND)×0.75 mm²
DHW pump output. Maximum load: 2 A (inrush), 230 V AC, 1 A
(continuous)
[9.2.2]
DHW pump
[9.2.3]
DHW pump schedule
1
Open the service cover. See
"7.3.2 To open the outdoor unit"
2
Connect the domestic hot water pump cable to the appropriate terminals as
shown in the illustration below.
X2M.1
X2M.2
1~M M2P
2
1
X2M
3
Fix the cable with cable ties to the cable tie mountings.
9.2.9 To connect the alarm output
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
[9.D]
Alarm output
1
Open the service cover. See
"7.3.2 To open the outdoor unit"
2
Connect the alarm output cable to the appropriate terminals as shown in the
illustration below.
7 9
YC
Y1
X2M
1
2
3
A4P
1+2
Wires connected to the alarm output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.