3
Fix the cable with cable ties to the cable tie mountings.
9.2.7 To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A]
Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X5M/6 and X5M/4; the negative polarity to X5M/5
and X5M/3.
1
Access the electrical connections. See
"9.2.1 To connect the electrical wiring
2
Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
X5M.6
S2S
S3S
X5M.5
X5M.4
X5M.3
180°
X5M
3 4 5 6
3
Fix the cable with cable ties to the cable tie mountings.
Summary of Contents for EBLA04E2V3