
4
|
Components
Service manual
210
EBLA04~08E + EDLA04~08E
Daikin Altherma 3 M
ESIE22-09 – 2022.05
4.17 Reactor
4.17.1 Checking procedures
To perform an electrical check of the reactor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
202].
DANGER: RISK OF ELECTROCUTION
Confirm the rectifier voltage is below 10 V DC before proceeding, see
254].
2
Visually check the reactor for any damage or burnt‑out components. If any
damage is found, replace the reactor, see
212].
3
Check that the reactors are firmly installed on the main PCB.
a
b
c
a
Reactor L803
b
Reactor L804
c
Reactor L903
4
Remove the main PCB, see
193]. The reactor
measuring points are ONLY reachable on the back side of the main PCB.
5
Measure the resistance of the reactor using a low ohm multi meter.
Result:
The resistance MUST be as follows:
Measuring points
Resistance
d‑e
29.6~44.4 mΩ
f
152~228 mΩ
g‑h
15.2~22.8 mΩ
i
96~144 mΩ
draft – 31/05/2022 15:53
Summary of Contents for EBLA04E V Series
Page 322: ...14 14...
Page 323: ......