
SiUS121632EA
Trial Operation and Field Settings
201
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation ............................................................................202
2. Forced Cooling Operation .......................................................................203
3. Wiring Error Check Function ...................................................................204
4. Trial Operation ........................................................................................ 206
4.1 CTXG, CTXS, FTXS, CDXS, FDXS, FVXS Series .................................. 206
4.2 FFQ Series ............................................................................................... 208
5.1 Outdoor Unit ............................................................................................. 211
5.2 CTXG, CTXS, FTXS, CDXS, FDXS, FVXS Series .................................. 213
5.3 FFQ Series ............................................................................................... 218
6. Silicone Grease on Power Transistor/Diode Bridge ................................ 226